COS Master Plan Final - 08/2013 height=
* *
*
* Search * *
*
*
*
*
COS Master Plan Final - 08/2013
  COS Master Plan Final - 08/2013
*
Airport Master Plan
FINAL TECHNICAL REPORT
(8/15/2013)
Table of Contents
Click on the chapters or appendixes to download them individually or download entire file in two volumes at the end of the page. NOTE: some files are large and may take a few minutes to load.
Preface and Table of Contents
EXECUTIVE SUMMARY
  • Introduction
    • Guiding Principles
    • Goals and Objectives
    • Master Planning Process
    • Existing Condition
  • Aviation Demand Forecast
    • Enplaned Passengers
    • Aircraft Operations
  • Alterntatives Identification and Evaluation
    • Recommended Airfield Alternatives
    • Passenger Terminal Facilities
    • Ground Transportation Facilities
    • General Aviation, Air Cargo, and Airport Support Facilities
  • Recommended Development Plan
    • Cost Estimates and Phasing
    • Anticipated Funding Sources
    • Capital Improvement Program
  • Environmental Review
Chapter 1. INTRODUCTION AND BACKGROUND
  • Introduction
    • Guiding Principles
    • Goals and Objectives
Chapter 2. EXISTING CONDITIONS
  • Introduction
  • Facilities Overview and Airport Land Use
  • Airfield
    • Runways
    • Taxiways
    • Apron Areas
    • Navigational Aids
    • Airspace and Air Traffic Control Overview
  • Passenger Terminal Complex
    • Aircraft Parking Apron
  • Ground Transportation Facilities
    • Terminal Area Access and Circulation Roadways
    • Cresterra Business Park Roadways
    • Curbside Facilities
    • Automobile Parking Facilities
  • Airline Support Facilities
    • Airline Maintenance and Support
    • Fuel Storage and Distribution
    • Glycol Storage and Treatment
  • Air Cargo
  • General Aviation
  • Airport Support Facilities
    • FAA Airport Traffic Control Tower
    • Aircraft Rescue and Fire Fighting Facilities
    • Airport Maintenance Facilities
    • Airport Administrative Facilities
  • Military Facilities
    • Peterson Air Force Base
    • A/DACG Facility
  • Infrastructure Assessment
    • Airfield Pavements
  • Off-Airport Land Use
  • Environmental Overview
    • Factors Affecting the Man-Made Environment
    • Factors Affecting the Natural Environment
Chapter 3. AVIATION DEMAND FORECAST
  • Forecast Update (2013)
    • Enplaned Passengers
    • Air Cargo
    • Aircraft Operations
    • Forecast Update Summary
  • Original Forecast (2010)
    • Forecast Process and Approach
    • Enplaned Passengers
    • Air Cargo
    • Aircraft Operations
    • Airport Service Region
  • Airport Role
    • Primary Commercial Service Airport in Colorado
    • Large Origin-Destination Passenger Base
    • Peterson Air Force Base
  • Economic Basis for Aviation Demand
    • Socioeconomic Trends
    • Economic Outlook
    • Risks to the Economic Outlook
    • Summary of the Economic Basis for Forecast Aviation Demand
  • Historical Airline Traffic
    • Airline Passenger Service and Market Shares
    • Enplaned Passengers
    • Regional Originating Passenger Market
    • Origin-Destination Markets
    • Airline Fares and Yields
    • Airline Fares and Service to Top 10 COS Markets
    • Monthly Airline Traffic
    • Air Cargo
  • Historical Aircraft Operations
    • Air Carrier
    • Air Taxi and Commuter
    • General Aviation
    • Military
    • Monthly Aircraft Operations
  • Original Aviation Demand Forecasts
    • Enplaned Passengers
    • Air Cargo
    • Aircraft Operations
  • Comparison with the FAA 2009 TAF
  • Forecasts of Peak Period Demand and Aircraft Fleet Distribution
    • Forecast Approach and Methodology
    • Peak Period Demand Forecasts
Chapter 4. FACILITY REQUIREMENTS
  • Introduction
    • Planning Activity Levels
    • Future Flight Schedules
    • Summary Of Requirements
  • Airfield And Airspace
    • Runway Use
    • Airfield Capacity
    • Assessment Of Runway Length Requirements
    • Wind And Weather Analysis
    • Airport Design Standards
    • Navigation Aids And Airfield Lighting
    • Obstacle Clearance Surface Assessment
    • Potential Impact Of Future Technologies
  • Passenger Terminal
    • Gates And Aircraft Parking
    • Passenger Holdrooms
    • Ticketing Lobby
    • Passenger Security Screening
    • Baggage Handling Systems
    • Concessions Space
  • Ground Transportation And Parking
    • Airport Access
    • Curbside Facilities
    • Parking
    • Rental Car Facilities
  • Air Cargo And General Aviation
    • Air Cargo
    • General Aviation
  • Aviation Support Facilities
    • Aircraft Rescue And Fire Fighting
    • Airport Administration
    • Airport Equipment And Maintenance
    • Aircraft Maintenance
    • De-Icing Fluid Storage And Processing
    • Airport Beacon
    • Fuel Storage And Distribution
  • Summary
Chapter 5. ALTERNATIVES
  • Airfield Alternatives
    • Airfield Goals And Objectives
    • Initial Alternatives
    • Primary Screening Of Airfield Alternatives
    • Secondary Screening Of Airfield Alternatives
    • Refined Alternatives
    • Finalist Alternatives
    • Recommended Airfield Alternative
  • Passenger Terminal Facilities
    • Passenger Boarding Bridge Analysis
    • Summary And Recommendations
    • Passenger Security Checkpoint
  • Ground Transportation Facilities
  • General Aviation, Air Cargo, and Airport Support Facilities
Chapter 6. RECOMMENDED DEVELOPMENT PLAN
  • Recommended Projects
  • Implementation Plan
    • Project Phasing
    • Capital Improvement Program
    • Anticipate Funding Sources
    • Cost Estimates
Chapter 7. ENVIRONMENTAL OVERVIEW
  • Introduction
  • Environmental Resources
    • Air Quality
    • Construction Impacts
    • Farmlands
    • Fish, Wildlife, and Plants
    • Hazardous Materials, Pollution Prevention, and Solid Waste
    • Historic, Architectural, Archaeological, and Cultural Resources
    • Light Emissions and Visual Impacts
    • Noise
    • Secondary (Induced) Impacts
    • Water Quality
    • Wetlands
    • Compatible Land Use
    • Resources Unaffected by the Proposed Improvements
  • Required Agency Coordination and Permitting
    • Air Quality
    • Farmlands
    • Fish, Wildlife, and Plants
    • Historical, Architectural, Archaeological, and Cultural Resources
    • Water Quality
    • Wetlands
    • Local Coordination
    • National Environmental Policy Act Review
Appendix A PAVEMENT CONDITION SUMMARY
Appendix B FORECAST UPDATE
Appendix C MATERIALS SUPPORTING ORIGINAL FORECAST
Appendix D PLANNING ACTIVITY LEVEL 4 FACILITY REQUIREMENTS
Appendix E WIND AND WEATHER ANALYSIS
Appendix F COST ESTIMATES
Appendix G DRAINAGE PLAN UPDATE
Appendix H TAKEOFF WEIGHT ANALYSIS OF RDP
Appendix I PUBLIC INVOLVEMENT MATERIALS
Appendix J GLOSSARY OF TERMS
Appendix K AIRPORT LAYOUT PLAN
Or download the entire file, in two volumes:

COS_MP-FinalTechnicalReportVol_1.pdf
file size = 35MB

COS_MP-FinalTechnicalReportVol_2.pdf
file size = 76MB

*


printer friendly versionPrinter friendly version
*