Fillmore/Union
Corridor Improvements
View
video on Triple Left Turn Lane
| Project
Description: The intent of the corridor improvements were
to combine two safety and traffic operations improvement projects
into a single design and construction project.
Fillmore/Union
Intersection
The project included:
- adding
an eastbound left-turn lane
- adding
a southbound through lane
- adding
a southbound right-turn lane
- modifying
the westbound lanes through to Templeton Gap Rd
- extending
the northbound acceleration/deceleration lane to Templeton
Gap Rd., and
- providing
new traffic signals.
Templeton Gap Rd. to Hancock Ave.
|

The finished
triple left turn lanes taht were a part of the improvements
to this location have been operating smoothly.

Construction
under way near the Fillmore/Union intersection.
|
|
Templeton
Gap Rd. to Hancock Avenue
The
project included:
- Widening
to provide for a third eastbound through lane, which became
a right-turn lane at Hancock Ave.
- reconstruction
of curb, gutter, sidewalks, and driveways as needed,
- new
traffic signals, and
- a
new storm drain system.
|

As
part of this project Colorado Springs drivers traveling east on
Fillmore Street who turn north onto Union Boulevard are using
the City's first side-by-side triple left turn lane. Drivers should
treat the triple left turn as they would any turn, by staying
in their lane of travel. To aid the traveling public the lanes
were built wider, 14 to 16 feet wide rather than the typical 11
to 12 foot width, and the lanes are delineated by dotted lines.
Total
Estimated Project Cost: $2.602M
Project
Schedule: Final Design/ROW/Bid - September 2005 to October
2006; Construction - September 2006 to May 2007.
Web
Site: www.springsgov.com
- Transportation Education
Project
Phone: 719-385-5918
Project
Managers: Mike King, Wilson & Co.
Andy Garton, City Engineering
Travis Easton, City RTA
|