00505 POPES BLUFF TRL

Review DateStatusComment(s)
7/22/2014 FYI*****(STANDARD COMMENT 1) This project is: This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI*****(STANDARD COMMENT) The special hazard suppression system is being installed by: CINTAS
FYI*****(STANDARD COMMENT) DESIGN: Type of System: AMEREX FM200 Size of System: 68 pounds Hazard Protected: server room
Attention*****(STANDARD COMMENT) REDLINED COMMENTS: The following RED-LINED items are to be corrected prior to final inspection: 1. There shall be a disctinctive pattern for each stage of alarm - 1st detector shall have a pattern, second detector shall have a different pattern. I recommend use of march time and then steady. Upon agent discharge the building alarm system enters the general alarm and evacuation temporal 3 pattern.
FYI(CLEAN AGENT) SIGNAGE: Warning and instruction signs shall be provided at the entrance to and inside the protected areas. (NFPA 2001:4.3.5.5)
FYI(CLEAN AGENT) PNEUMATIC TESTING Pneumatic test of 40 psi for a duration of 10 minutes - pressure drop shall not exceed 20% of the test pressure. (NFPA 2001:7.7.2.2.12)
FYI(CLEAN AGENT) AIR FLOW TEST: Air flow test (nitrogen or inert gas) on piping network to verify flow is continuous and piping and nozzles are unobstructed. (NFPA 2001:7.7.2.2.13)
FYI(CLEAN AGENT) NOZZLES: All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease, vapors, moisture or other foreign materials into the piping. (NFPA 2001:4.2.5.4)
FYI(STANDARD COMMENT 5) INDICATION OF SYSTEM ACTIVATION: An audible OR visual indication shall be provided that the system has operated, that personnel response is needed, and that the system is inneed of recharge. (IFC 904.3.4)
FYI(STANDARD COMMENT 6) FIRE ALARM SYSTEM CONNNECTIONS: The extinguishing system shall be connected to the fire alarm system, if provided, in accordance with NFPA 72. (IFC 904.3.5)
FYI(STANDARD COMMENT) LICENSED INSTALLER/SERVICE TECHNICIAN An On-Site Installer/Service Technicial shall supervise all on-site work on any fire protection system. This On-Site Installer shall have a current Installer Certificate (RBD Wallet Card), on his/her person, while on the job site.
FYI(STANDARD COMMENT 8) CERTIFICATE OF INSTALLATION: It is the installer's responsibility to certify through this form that the system has been properly installed and tested. The form is to be filled out in its entirety PRIOR TO THE ARRIVAL OF THE FIRE INSPECTOR that is conducting the final inspection and/or the acceptance test of the system. FINAL INSPECITONS WILL NOT BE CONDUCTED WITHOUT THIS FORM BEING COMPLETED.
FYI(STANDARD COMMENT 9) MANUFACTURER'S DATA The approved set of system plans, manufacture's product data sheets on all equipment being installed, and the installation permit are to be on site for all fire department inspections.
FYI(STANDARD COMMENT 10) INSPECTIONS Due to the dynamic nature of inspectors schedules, PLEASE call your inspection requests in with ample time to allow scheduling. Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( i.e. 20001234 - HM -2 or 20000012 - CN - 1) The CSFD Approved sets of plans are to be on site for all inspections.
FYI(STANDARD COMMENT 15) PLAN REVIEW/PERMIT FEES All fire department fees are to be paid prior to issuance of any permits. These fees must be paid directly to the Colorado Springs Fire Department - Development Review Enterprise - at 2880 International Circle - Suite 200-7.
FYI(STANDARD COMMENT) REVIEWS: Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirement are met as established by the Authority Having Jurisdiction, whether of not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the fire code requirements of the adopted International Fire Code, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)
6/19/2014 FYI*****(STANDARD COMMENT 1) This project is: Youth with a Mission, 505 Popes Bluffs Trl: special hazard suppression system This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI*****(STANDARD COMMENT) The special hazard suppression system is being installed by: CINTAS
FYI(STANDARD COMMENT) REVIEWS: Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirement are met as established by the Authority Having Jurisdiction, whether of not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the fire code requirements of the adopted International Fire Code, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)
Disapproved(STANDARD COMMENT 20) DISAPPROVED COMMENTS: The following information and/or corrections are needed prior to completing a full plan review. PLEASE RESPOND IN WRITING ON LETTERHEAD TO EACH OF THE FOLLOWING COMMENTS: 1. Plans are a mix of items from a different project. 2. Building key plan is not provided. 3. Room name and hazard protected is not provided. 4. Voltage drop calculations for notificatin appliances is not provided 5. Device legend is incomplete 6. some of the sheets are cut off incomplete submittal - reference the information packet provided to you for a complete submittal. Also review the disapproved plans for additional written comments prior to submittal of new plans.
Attention(STANDARD COMMENT 23) NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.


 