NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

WALMART STORE NO 4335
11550 MERIDIAN MARKET VW

Review DateStatusComment(s)
6/18/2014 E-MailKay, Sorry for the previous phone message, we had your email wrong. Please find below a narrative of the Auto Center scope of work involved in this remodel. Environmental Cage " The waste oil tank is to be relocated to allow for visual inspection between the tank and fence as well as providing the required separation from the building. " The filter bin within the cage is to be relocated to allow for relocation of the previously mentioned waste oil tank. " The second filter bin located outside the cage is to be removed. " 4 Bollards are being added to provide proper protection to the waste oil tank Auto Center (Lube & Tire Mounting Area) " Within the service bay, the waste oil tank is being relocated to allow for installation of protective bollards. " As a result of the tank being relocated, the waste oil lines and venting are being revised. " The tire changer will also be relocated to allow for relocation of the waste oil tank. Auto Center (Lube Pit) " A second eyewash is being installed, the water supply will come from within the mechanical room. If you have any additional questions regarding the scope of work for this project please do not hesitate to contact me. My direct phone number is listed below. Thank you, Scott Brown | Assoc. AIA, LEED AP BRR Architecture, Inc. 6700 Antioch Plaza, Suite 300 Merriam, KS 66204 Direct: 913-236-3349 Main: 913-262-9095 www.brrarch.com Kansas City o Bentonville o Phoenix o San Francisco Philadelphia o Atlanta o Miami o Los Angeles o Chicago
FYIThe scope of work narrative has been received and approved. SEE ELECTRONIC DOCUMENTS 1) No new tank installation and no tank removals. 2) Waste Oil tank within the autocenter is be relocated within the autocenter. Piping and venting will tie into existing distribution systems; and vents through roof. OK 3) Exterior Cage: Waste Oil tank is being located to comply with current code so that it is 5 ft away from structure and filter bin moved a bit to accomodate the waste oil tank within the cage. No impact to any existing hazardous materials: no increase, no decrease. Per Mr. Brown, architect, modifications to comply with current code.
6/17/2014 FYIWal Mart, 11550 Meridian Market Vw: interior remodel - FALCON FPD DELEGATED REVIEW SYSTEMS: fire sprinkelr for area; fire alarm for occupancy CN:Code: 09 IBC - 09 IFC -11 PPRBC /Class:M / Const: V-B /Stories: 1/Size: 30,000 /OL: NO CHANGE HAZMAT REVIEW
DisapprovedINCOMPLETE SUBMITTAL - Currently, your submittal is incomplete. No hazardous materials information was provided with this plan submittal. In order to provide an adequate review of your proposal, please ensure that all of the following items have been submitted. Failure to do so may result in delays of your plan review.) The following items must be provided to the CSFD PRIOR IN ORDER TO COMPLETE THIS PLAN REVIEW AND PRIOR TO requesting your fire finals for occupancy. The storage, use and/or dispensing of hazardous materials within this facility shall be in accordance with all applicable provisions of the 2009 International Fire Code. 1) Provide a scope of work and describe the chemicals, commodities, hazardous materials impacted by this project/remodel. Appears that Auto Center and TLE and Environmental Cage are the impacted areas. Please provide scope of work that will occur at these and/or other locations. Plan reviewer spoke with Theresa Jones 6/17/14. Ms. Jones will have information emailed to Plan Reviewer. Please describe the installation, removal and "relocation" of any tanks as noted on Auto Center Plan Sheet AC1 Waste oil and bulk oil tanks noted ? Please describe scope of work. IMPACTED BY THIS PROJECT. Are there changes in location of storage? Increase or decrease in quantities? Adding or eliminating hazardous materials? Are there impacts on hazardous materials and locations stored/used and quantities? Are new or used tanks involved.?
FYICORRECTIONS. All corrections and comments are to be submitted back to CSFD in writing, or provide submittal sheets/drawings/ blueprints etc. as requested, to complete the review.


 