NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

UCCS KRAEMER LIBRARY UPPER LEVEL BLDG 12
01420 AUSTIN BLUFFS PKWY

Review DateStatusComment(s)
6/3/2014 FYI*****(STANDARD COMMENT 1) This project is: UCCS El Pomar Libary 1420 Austin Bluffs Py Rm 311 Remodel This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI***** 5-DEVICE LETTER: Date of Work: 6/3/14 Contractor: A-VAR Electric Scope : 2 strobes Location of work: Room 311 Bldg permit #: N/A
5/30/2014 DisapprovedSame letter as yesterday was submitted. Email to SGFP: From: Embres, Rhonda C. Sent: Friday, May 30, 2014 4:34 PM To: 'Kerley, Vincent' Subject: RE: UCCS El Pomar Library University Center 3rd Floor Importance: High This explains a lot! Someone did bring plans in and said they were for a 5 device letter and I told Shawn at the front desk to tell them I could not accept plans without the letter. I didn't realize this was the project they were talking about. I have contacted the person @ UCCS who draws up their construction plans and told her the GC needs to submit construction drawings. I expect this may happen on Monday. Rhonda Embres Senior Fire Inspector Colorado Springs Fire Department From: Kerley, Vincent [mailto:VKerley@simplexgrinnell.com] Sent: Friday, May 30, 2014 4:28 PM To: Embres, Rhonda C. Subject: RE: UCCS El Pomar Library University Center 3rd Floor Yeah I was surprised the electrical contractor wanted the letter as well. He was told from the front desk person there that they needed to drop both off at the same time. The construction prints as well as that 5DL. I don't know why they told them that because We, being Ki and myself told the electrical contractor that they will need to inform the general contractor to drop off the construction plans first for review and approval from CSFD, then after the approval we can resubmit the 5DL. I will inform Ki again of this and he will have to explain to the electrical and the general contractor the processes again. Thanks Rhonda. Have a good weekend, Vince From: Embres, Rhonda C. [mailto:REmbres@springsgov.com] Sent: Friday, May 30, 2014 4:22 PM To: Kerley, Vincent; Kleinheitz, Daniel Subject: UCCS El Pomar Library University Center 3rd Floor Importance: High Yesterday I received this letter and disapproved it because we had not yet done a construction review for the project. Today someone brought the same letter in, just with a larger set of plans. This is still disapproved. I need the general contractor to bring in the construction project plans to be reviewed and approved. Thank you Rhonda Embres Senior Fire Inspector Colorado Springs Fire Department ************************************************************* Made telephone call to Mariness @ UCCS who draws their construction plans 255-3073 to relay what needs to be done to correct this situation.
5/29/2014 FYI*****(STANDARD COMMENT 1) This project is: UCCS El Pomar Libary University Center 1420 Austin Bluffs Py 3rd Flr Rm 311 Remodel This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
Disapproved***** 5-DEVICE LETTER DISAPPROVALS: --XX---This work requires a building permit or at minimum a fire construction review


 