12/27/2013 FYI*****(STANDARD COMMENT 1) This project is: Art Klein 3370 Chelton Lp S Deficiency correction This plan review is based on the requirements found within the adopted Editions of the International Building Code, International Fire Code and the related Standards.
FYI***** 20-HEAD LETTER: Date Submitted: 12/27/13 Contractor: Arapahoe Total number of heads affected : 16 plus floater main Location of work: Warehouse where halon system previously existed Bldg permit #: N/A Flex Connections approved in this facility?: NO Brand: if known Equivalent Length: if known UL 2443/FM 1637 Complaint:
12/20/2013 Disapproved*****20-HEAD LETTER DISAPPROVALS -----Multiple letters have been submitted for this scope of work/building permit, thus the total modifications exceed 20-heads. --XX---The information you have provided is not complete, please provide the following: Why is work being completed if there is no construction. This is quite a few heads to be for "Sprinkler Work Only" --XX---It appears a building permit is required for the construction work associated with this work.


 