NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

PENROSE MAIN
02222 NEVADA AVE

Review DateStatusComment(s)
9/17/2013 FYIPenrose Hospital, 2222 N Nevada Av: interior remodel - hybrid operating room SYSTEMS: fire sprinklers for occupancy/use; fire alarm for occupancy CN:Code: 09 IBC -09 IFC -11 PPRBC /Class: I-2 / Const: I-B /Stories:2ND THIS SCOPE /Size:3267 /OL: 131 Additional Comments: MEDICAL GAS REVIEW HYBRID OPERATING ROOMS RENOVATION 2ND FLOOR. DEMOLITION AND RE INSTALL MED GAS DISTRIBUTION SYSTEM. www.springsgov.com - go to "City Agencies" (tab on the teal bar to get a drop box) - click on - "Fire Department" - (Using the links down the left side of the page), click on - "Web Guide." Once you're into the Web Guide, click on "Plan Review Status" This will also give you access to numerous other items that may assist you in your future project design work.
FYIMED GAS SYSTEMS These requirements shall apply to all facilities described in Section 3006.1 of the 2009 International Fire Code. **The requirements of NFPA 99 will apply to all piped Med Gas Systems, including Oxygen, Nitrogen Oxides, Waste Gas, Medical Air and Vacuum based on their LEVEL Designation (1, 2 or 3) as defined by NFPA 99. All Med Gas (piped) systems shall be installed and maintained in accordance with all applicable provisions of 2009 International Fire Code Chapters 27 (Hazardous Materials), 30 (Compressed Gases) and 40 (Oxidizers). **Oxidizing Cryogenic fluids shall comply with IFC 2009 Chapter 32 and NFPA 55. **All Med Gas (piped) systems that utilize a source of commonly located compressed gas cylinders as shall have all cylinders, related manifolding and electronics (if electronic monitoring required by NFPA 99) in a room that complies with 2009 IFC Section 3006 (or) gas cabinets that comply with 3006.3. **This medical gas system is a Category/Level 1 medical gas system
I*** Medical Gas SCOPE OF WORK *** 2nd floor. PLAN SHEETS P100 AND P322. HYBRID SUITE #212 PLAN SHEET P502.3A dated 8/30/13; shows new pipe distribution system per NFPA 99 *** Oxygen, WAGD, vacuum, N2O, N, Medical Air & Vacuum
FYINFPA 99, LEVEL 1 PIPED GAS & VACUUM SYSTEMS CURRENT EDITION NFPA 99 SHALL APPLY These systems shall conform to ALL applicable requirements of NFPA 99, including, but NOT LIMITED TO: -Door Labeling per 5.1.3.1.5 -Operational considerations per 5.1.3.2 and 5.1.3.3 -Valving, connections, components, manifolding, etc. per 5.1.3.4 and 5.1.4 -An alarm system per 5.1.9 as excepted by 5.1.9.1 -Special piping per 5.1.10 -Installation of piping per 5.1.10.3 thru 5.1.10.10 -Qualified Installers per 5.1.10.10 -Pipe labeling per 5.1.11 -Independent Performance Testing per 5.1.12 -System Management per 5.1.13 -Air system requirements as shown in 5.1.3.5 -Vac System requirements as shown in 5.1.3.6
FYICHEMICAL INVENTORY, AS DECLARED **** NO CHEMICAL INVENTORY OR IMPACTS WERE REPORTED. THERE ARE NO MATERIAL CHANGES OR IMPACTS TO THE EXISTING MEDICAL SUPPLY SOURCES FOR THIS SCOPE OF WORK. email 9/17/13: Kay, There will be no impact to the medical gas supply sources for the indicated scope of work related to the Hybrid OR project at Penrose Hospital located at 2222 North Nevada. Paul R. Reu RTA Architects
FYILOCATION OF PIPING NFPA 99 Section 5.1.10.10.5 Location of piping shall be located in accordance with 5.1.10.10.5.1 (A) through 5.1.10.10.5.1(C) AND Piping shall be permitted to be installed overhead where possible. Piping shall NOT be installed in electrical switchgear rooms, elevator shafts and areas having open flames. Piping shall NOT be located where subject to contact with oil.
FYILabeling - An NFPA 704 compliant Hazard Placard is required for each pedestrian entry door rooms containing hazardous materials in excess of the exempt amounts (this door could be interior or exterior) and all such doors shall be included. The minimum size of the Hazard Placard shall be 15" by 15". This requirement is subject to verification at the time of the Hazardous materials Inspection prior to signing the Fire Final. Piping shall be labeled in accordance with ANSI 13.1B MEDICAL GAS ROOM LABELING * Signs shall be posted for all harzards and warnings associated with medical gases. NFPA 704 Label all containers and cylinders with contents. * Piping shall be labeled in accordance with IFC 2009, CHAPTER 30 and NFPA 99, current ed. LABELING ON BOTH SIDES OF PARTION OR WALLS PENTETRATED BY THE PIPING * AT LEAST ONCE IN EVERY STORY HEIGHT TRAVERSED BY RISERS * Rooms shall be labeled as follows: CAUTION MEDICAL GASES OXIDIZING GAS STORED WITHIN NO SMOKING OR OPEN FLAME
AttentionINSPECTIONS ATTENTION CONTRACTOR Medical Gas system piping installation requires MULTIPLE INSPECTIONS by the CSFD due to installation requirements and procedures. ALL PORTIONS OF PIPING SYSTEMS SHALL REQUIRE INSPECTION; no piping shall be sealed or concealed prior to inspection. Contact the CSFD Office of the Fire Marshal at 385-5978 for an inspection schedule for this project. All paperwork, documentation, installer/verifier certifications, and needed test equipment shall be available upon Inspector's request. Performance Testing is required per 5.1.12. Independent Testing for specific conformance to the requirements of NFPA 99 will be required. Performance testing documentation and inspection is subject to field verification by the Fire Inspector. **** PLEASE CONTACT THE CSFD DIV OF THE FIRE MARSHAL @ 719-385-5978 TO SCHEDULE THE HAZARDOUS MATERIALS SPECIALIST INSPECTOR, J. WEIGHTMAN. MULTIPLE INSPECTIONS MAY BE REQUIRED.
AttentionCREDENTIALS AND CERTIFICATIONS American Society of Sanitary Engineers (ASSE) Medical Gas Installer, Medical Gas Verifier and Brazing certification credentials, or documents shall be required prior to commencement of work, and on site and available AT ALL TIMES for inspection by the CSFD. CREDENTIALS SHALL BE CURRENT. Performance Testing is required per 5.1.12. Independent Testing for specific conformance to the requirements of NFPA 99 will be required. Performance testing documentation and inspection is subject to field verification by the Fire Inspector.
AttentionATTENTION: CONTRACTOR SHALL MAKE AVAILABLE TO THE INSPECTOR: SPECIFICATIONS, DOCUMENTATION, LISTINGS, VERIFICATION BY 3RD PARTY TESTING. ANY FIELD MODICATIONS SHALL BE DOCUMENTED AND SUBMITTED ON ENGINEER STAMPED AS BUILT PLANS, AND RESUBMITTED TO THE CSFD AND/OR FIRE INSPECTOR.
FYIHMMP - A Hazardous Materials Management Plan (HMMP) must be developed, submitted, and continuously maintained for this location. St. Francis Medical Complex is enrolled in the Hazmat permit program.


 