NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

UCH MEMORIAL HEALTH CENTRAL POWER PLANT
01400 BOULDER ST

Review DateStatusComment(s)
8/5/2013 FYIThis project is Memorial Hospital, Power Plant 1400 E Boulder St: Phase 1 boiler replacement and fuel oil piping SYSTEMS: fire sprinkler for area; waterlfow alarm (2013) CN:Code: 09 IBC - 09 IFC -11 PPRBC /Class: S1 / Const: II-B /Stories: 1/Size: 3139 /OL: 11
DisapprovedCHEMICAL INVENTORY NOT DECLARED. In order to complete this plan review a chemical inventory of the material impacted or added or deleted must be resubmitted with these plans. 8/5/13 Plan reviewer contacted Mark of Intergroup and requested chemical inventory information. Mark requested plan reviewer hold on plans and would gather needed info and submit to plan reviewer 8/6/13 Information not obtained by Mark. Plan reviewer sent plans on to utilities DISAPPROVED.


 