NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

UCH MEMORIAL HEALTH BLDG 16 WOMEN AND CHILDREN CTR
01400 BOULDER ST

Review DateStatusComment(s)
5/15/2013 E-MailFrom: Kleinheitz, Daniel [mailto:dkleinheitz@simplexgrinnell.com] Sent: Tuesday, May 14, 2013 9:22 AM To: Withee, Doreen E Subject: RE: Memorial Hospital- East Tower Damper Detectors- 5 Device Letter Sorry Steve never got back to you on this.. Scope of work is not clear as to whether we are dealing with duct detectors or dampers. It sounds from your response, we are dealing with smoke dampers. The dampers which are remaining are a fire/smoke damper. We need to remove the duct detector within the duct work that samples the air after the damper but before it is supplied into the room. A smoke detector will be installed within Lactation Room 3N3151 to sample the air as the duct detector did do not restrict air flow or damper closure as the duct detector currently does. Currently there is already a smoke detector within Patient Room 3N3143 which will serve the same purpose. Are these dampers located at fire/smoke barrier penetrations? We need to know what type of wall is being penetrated to require the damper in the first place, so we can reference the correct section of the codes.. Are we dealing with a Fire Wall, Fire Barrier, Smoke Barrier, or Fire Partition or none of the above? I had my tech go out there and confirm with the hospital that the wall is a fire partition. The referenced sections within the scope of work do not exist. There is no section 716 of the IMC. If you were intending to reference 2009 IBC 716.3.2.1 #5, regarding total detection then you must also include the area above the ceiling. You are right, I'm referencing 716 in IBC but also (which is the same reference) 607.5.4.1 in IMC. Item 5 is the code I'm intending to adhere to as the RTU has duct detection and areas served have smoke detection and/or duct detection at smoke damper locations. I hope this helps. : Daniel J Kleinheitz / Designer/ Project Manager / SimplexGrinnell Tel: +1-719-799-2156 / Fax: +1-719-574-1253 / Cell: +1-719-200-4850 915 Valley Street / Colorado Springs, CO, 80915 / USA dkleinheitz@simplexgrinnell.com / www.simplexgrinnell.com From: Withee, Doreen E [mailto:DWithee@springsgov.com] Sent: Monday, May 13, 2013 10:30 AM To: Kleinheitz, Daniel Subject: FW: Memorial Hospital- East Tower Damper Detectors- 5 Device Letter No response was received - letter has been denied. Dee Withee, CET, CFPS From: Withee, Doreen E Sent: Tuesday, May 07, 2013 12:56 PM To: 'Sharp, Steven' Subject: FW: Memorial Hospital- East Tower Damper Detectors- 5 Device Letter Steve - I received an auto-reply that Daniel is out of the office#.Not sure if you are familiar with the project#. Dee Withee, CET, CFPS From: Withee, Doreen E Sent: Tuesday, May 07, 2013 12:29 PM To: 'Kleinheitz, Daniel' Subject: RE: Memorial Hospital- East Tower Damper Detectors- 5 Device Letter Daniel - I've read your response, but I don't think you answered all the questions. Scope of work is not clear as to whether we are dealing with duct detectors or dampers. It sounds from your response, we are dealing with smoke dampers. Are these dampers located at fire/smoke barrier penetrations? We need to know what type of wall is being penetrated to require the damper in the first place, so we can reference the correct section of the codes.. Are we dealing with a Fire Wall, Fire Barrier, Smoke Barrier, or Fire Partition or none of the above? The referenced sections within the scope of work do not exist. There is no section 716 of the IMC. If you were intending to reference 2009 IBC 716.3.2.1 #5, regarding total detection then you must also include the area above the ceiling. Dee Withee, CET, CFPS
FYI***** 5-DEVICE LETTER: Date Submitted: 5/14/13 Date of Work: ON APPROVAL Contractor: ELIGHT ELECTRIC Scope : REPLACE DUCT DETECTORS WITH AREA DETECTION FOR FIRE/SMOKE DAMPER OPERATION Current Draw: 7.8 Battery Size: 33 Location of work: WMNS CHILDRENS TOWER - 3RD FLOOR Bldg permit #: N/A NOTE: Fire/smoke damper is required in the Fire Partition. Actuation of the damper shall be by operating temperature of approximately 50 degrees above normal but not less than 160 degrees AND area detection within the area served by the HVAC in accordance with Section 607 of the 2009 IMC and section 716 of the 2009 IBC.
5/13/2013 E-MailFrom: Withee, Doreen E Sent: Tuesday, May 07, 2013 12:56 PM To: 'Sharp, Steven' Subject: FW: Memorial Hospital- East Tower Damper Detectors- 5 Device Letter Steve - I received an auto-reply that Daniel is out of the office#.Not sure if you are familiar with the project#. Dee Withee, CET, CFPS From: Withee, Doreen E Sent: Tuesday, May 07, 2013 12:29 PM To: 'Kleinheitz, Daniel' Subject: RE: Memorial Hospital- East Tower Damper Detectors- 5 Device Letter Daniel - I've read your response, but I don't think you answered all the questions. Scope of work is not clear as to whether we are dealing with duct detectors or dampers. It sounds from your response, we are dealing with smoke dampers. Are these dampers located at fire/smoke barrier penetrations? We need to know what type of wall is being penetrated to require the damper in the first place, so we can reference the correct section of the codes.. Are we dealing with a Fire Wall, Fire Barrier, Smoke Barrier, or Fire Partition or none of the above? The referenced sections within the scope of work do not exist. There is no section 716 of the IMC. If you were intending to reference 2009 IBC 716.3.2.1 #5, regarding total detection then you must also include the area above the ceiling. Dee Withee, CET, CFPS From: Kleinheitz, Daniel [mailto:dkleinheitz@simplexgrinnell.com] Sent: Thursday, May 02, 2013 12:12 PM To: Withee, Doreen E Cc: Bruce Brown Subject: FW: Memorial Hospital- East Tower Damper Detectors- 5 Device Letter Morning Dee, I've attached a letter in response for the disapproval of the 5 Device letter for this project. Let me know if you have any questions or concerns. Daniel J Kleinheitz / Designer/ Project Manager / SimplexGrinnell Tel: +1-719-799-2156 / Fax: +1-719-574-1253 / Cell: +1-719-200-4850 915 Valley Street / Colorado Springs, CO, 80915 / USA dkleinheitz@simplexgrinnell.com / www.simplexgrinnell.com _____________________________________________ From: Kleinheitz, Daniel Sent: Thursday, April 04, 2013 1:36 PM To: (fireconstructionservices@springsgov.com) Cc: Bruce Brown (bbrown@elightelectric.com) Subject: Memorial Hospital- East Tower Damper Detectors- 5 Device Letter Afternoon, Memorial Hospital- East Tower Damper Detectors will be submitted as a "5 Device Letter". The attachment should have all necessary paper work for a submittal. Please note that "Elight Electric" will be pulling the permit and installing contractor. If you have any questions or concerns, please call. Thank you. Daniel J Kleinheitz / Designer/ Project Manager / SimplexGrinnell Tel: +1-719-799-2156 / Fax: +1-719-574-1253 / Cell: +1-719-200-4850
Disapproved***** 5-DEVICE LETTER DISAPPROVALS: --XXX---The information you have provided is not complete, please provide the following: Questions were not answered - reference email.
4/5/2013 Disapproved***** 5-DEVICE LETTER DISAPPROVALS: --XXX---The information you have provided is not complete, please provide the following: 1. Scope of work is not clear as to whether we are dealing with duct detectors or dampers. If dampers, are they fire/smoke dampers or just smoke dampers? Are these located at fire/smoke barrier penetrations? Are they at air transfer grills? The referenced sections within the scope of work do not exist. If you are using total detection as indicated in IBC 716.3.2.1 #5, then you must also include the area above the ceiling.


 