CSU NORTH WASTEWATER PLT - HEADWORKS BD
00195 AERATION VW

Review DateStatusComment(s)
1/3/2013 FYICSU WHEY FERMENTATION SYSTEM DESIGN 195 (185) AERATION VW SYSTEMS: CN:Code: 09 IBC - 09 IFC - PPRBC /Class: U/ Const: VB /Stories: 1 /Size: /OL: Additional Comments: install whey tank, and associated piping system with treatment chemicals
FYISCOPE OF WORK INSTALL WHEY TANK AND ASSOCIATION PIPING SYSTEM (UNDERGROUND) CONNECTS TO EXISTING SYSTEMS ON SITE: NAOH AND NACLO (sodium hydroxide and sodium hypochlorite treatment systems SEE ELECTRONIC DOCUMENTS FOR SCOPE OF WORK PLAN SHEET C 4 SHOWS UNDERGROUND PIPING (doublewall and monitored) for the sodium hydroxide. piping runs underground and below street. Piping is leak detection monitored through existing scada system and double wall. Per Bruce Zook CSU project mgr: this tank installation is most associated with 195 AERATION VW structure on site and is nearest to 195. Enumerations gave the tank 185....not planned on being used. No hazmat inspection required.


 