| Review Date | Status | Comment(s) |
| 1/29/2013 |
FYI | *****(STANDARD COMMENT) This project is: Velvet Hills Show Chorus, 3815 N Academy Bl: interior remodel - change of occupancy
Date of Plans: 11.13.12
You can access our web site for the latest fire department plan review comments:
1. From www.pprbd.org, select PLAN REVIEW then FIND PLANS next COLORADO SPRINGS
2. Scroll down to the correct address. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
|
| FYI | (STANDARD COMMENT) CHANGE OF USE/OCCUPANCY
It appears this project is a change of use or occupancy for this building. As such, the building must meet the current adopted fire code for its new use/occupancy. |
| Disapproved | *****(STANDARD COMMENT 19) DISAPPROVED COMMENTS
The following information and/or corrections are needed prior to completing a full plan review. Please respond, in writing on letterhead, to each of the following comments:
1. Through review of the 2009 IEBC, it appears sprinklers are required on the first floor of this change in occupancy:
2009 IEBC 904 references Section 912 applies where change of occupancy
912.1.1.2 change of occupancy w/ separation from remainder of building - Chapter 8 shall apply to portion changing occupancy.
804.1 Sprinkler shall be provided when required by 704.2.
704.2.2Group A occupancies...that have exits serving OL greater than 30 shall be provided with sprinklers where the work area is required to be provided with sprinklers per IBC AND the work area exceed 50% of the floor area AND the building has sufficent municipal water supply.
912.2.1 such fire sprinkler shall be provided throughout the area where the change of occupancy occurs.
Plans shall reflect sprinklers to be installed on the first floor as well.
Also review the disapproved plans for additional written comments prior to submittal of new plans. |
| FYI | (STANDARD COMMENT) CORRECTIONS
All corrections and comments are to be submitted back to CSFD in writing, or provid submittal sheets/drawings, etc as requested, to complete the review. Corrections are not accepted over the phone, via fax or verbally.
|
| Attention | (STANDARD COMMENT) THE DISAPPROVED ITEMS MAY NOT CONSITITUE A COMPLETE LIST OF VIOLATIONS.
IT IS THE RESPONSIBILITY OF THE DESIGNER/ARCHITECT TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE ADOPTED CODES/STANDARDS AND INCORRECT INFORMATION PRIO TO RESUBMITTING.
|
| FYI | (STANDARD COMMENT) RESUBMITTALS
Re-reviews may be submitted back to the CSFD by direct submittal at the Construction Services counter, or through the Regional Building Department's routing system.
|
| FYI | (STANDARD COMMENT) REVIEWS
Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents.
The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.
(105.4.4)
|
| 12/3/2012 |
FYI | *****(STANDARD COMMENT) This project is: Velvet Hills Show Chorus, 3815 N Academy Bl: interior remodel - change of occupancy
Date of Plans: 11.13.12
You can access our web site for the latest fire department plan review comments:
1. From www.pprbd.org, select PLAN REVIEW then FIND PLANS next COLORADO SPRINGS
2. Scroll down to the correct address. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
|
| FYI | (STANDARD COMMENT) CHANGE OF USE/OCCUPANCY
It appears this project is a change of use or occupancy for this building. As such, the building must meet the current adopted fire code for its new use/occupancy. |
| Disapproved | *****(STANDARD COMMENT 19) DISAPPROVED COMMENTS
The following information and/or corrections are needed prior to completing a full plan review. Please respond, in writing on letterhead, to each of the following comments:
1. RBD Sticker must be filled out - I cannot permform a complete review without this information being filled in.
2. Numerous RBD issues affecting CSFD review must be address prior to my re-review.
Also review the disapproved plans for additional written comments prior to submittal of new plans. |
| FYI | (STANDARD COMMENT) CORRECTIONS
All corrections and comments are to be submitted back to CSFD in writing, or provid submittal sheets/drawings, etc as requested, to complete the review. Corrections are not accepted over the phone, via fax or verbally.
|
| Attention | (STANDARD COMMENT) THE DISAPPROVED ITEMS MAY NOT CONSITITUE A COMPLETE LIST OF VIOLATIONS.
IT IS THE RESPONSIBILITY OF THE DESIGNER/ARCHITECT TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE ADOPTED CODES/STANDARDS AND INCORRECT INFORMATION PRIO TO RESUBMITTING.
|
| FYI | (STANDARD COMMENT) RESUBMITTALS
Re-reviews may be submitted back to the CSFD by direct submittal at the Construction Services counter, or through the Regional Building Department's routing system.
|
| FYI | (STANDARD COMMENT) REVIEWS
Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents.
The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.
(105.4.4)
|