NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING. System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.
HEALTHCARE REALTY MGMT - UNIT 200 04105 BRIARGATE PY
| Review Date | Status | Comment(s) |
| 12/17/2012 |
FYI | ***** 5-DEVICE LETTER:
Date Submitted: 12/11/12
Date of Work: 12/17/12
Contractor: ESI
Scope : Add notification
Current Draw: 6.26AH ***
Battery Size: 12V/7.2AH
Location of work: Ste 200 Remodel
Bldg permit #: I55984
***Letter submitted that although calcs are significantly lower than previous, actual readings were taken from the panel. Letter to file.
|
| 12/13/2012 |
Disapproved | ***** 5-DEVICE LETTER DISAPPROVALS:
--XX---The information you have provided is not complete, please provide the following:
Explanation as to why calcs are 6 AH less than previous submittal.
|
|