NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING. System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.
BOB PENKHUS MAZDA 07455 TEST DR
| Review Date | Status | Comment(s) |
| 1/24/2013 |
FYI | ***** 5-DEVICE LETTER:
Date Submitted: 01/23/13
Date of Work: 01/24/13
Contractor: SGFP
Scope : Waterflow, tamper, and exterior Horn/strobe being relocated
Current Draw: 9.909 AH
Battery Size: 12V/12.7AH
Location of work: Main
Bldg permit #:G87256
|
| 1/23/2013 |
Approved | Have received 2 submissions today. One did not contain the "designer" signature and the second does not have current, updated calcs. |
| 1/18/2013 |
Disapproved | ***** 5-DEVICE LETTER DISAPPROVALS:
---XX--The information you have provided is not complete, please provide the following:
No drawing
No RME signature
Application not complete (no indication of addressable/conventional)
|
|