NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING. System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.
KISSING CAMELS OFFICE PARK BLDG I 02955 PROFESSIONAL PL
| Review Date | Status | Comment(s) |
| 1/18/2013 |
Approved | Letter revised to 10 heads instead of 4 due to field inspection. |
| 1/16/2013 |
Approved | Adding 6 additional heads to original approval. New letter and drawing required. |
| 12/28/2012 |
FYI | ***** 20-HEAD LETTER:
Date Submitted: 12/28/12
Contractor: Brickwall
Total number of heads affected : 4
Location of work: Corridor
Bldg permit #: I53376
Flex Connections approved in this facility?: NO
Brand: if known
Equivalent Length: if known
UL 2443/FM 1637 Complaint: |
|