NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING. System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.
XLEDGER.NET 01310 UNITED HT
| Review Date | Status | Comment(s) |
| 10/15/2012 |
FYI | ***** 20-HEAD LETTER:
Date Submitted: 10/15/12
Contractor: M & M FP
Total number of heads affected : 17
Location of work: Ste 215
Bldg permit #: I41322
Flex Connections approved in this facility?: NO
Brand: if known
Equivalent Length: if known
UL 2443/FM 1637 Complaint: |
| 10/12/2012 |
Disapproved | *****20-HEAD LETTER DISAPPROVALS
--XX---The information you have provided is not complete, please provide the following:
1. CSFD Plan Review # required
2. Need Job Start date
3. Need Job End date
4. Need drawing indicating work and existing coverage in tenant space
|
|