FYI | *****(STANDARD COMMENT) This project is: Penrose Equestrian Center, 1045 Lower Gold Camp Rd: addition to arena
Date of Plans: 8.30.12
You can access our web site for the latest fire department plan review comments:
1. From www.pprbd.org, select PLAN REVIEW then FIND PLANS next COLORADO SPRINGS
2. Scroll down to the correct address. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
|
| FYI | (STANDARD COMMENT) IMPACT TO EXITING AND/OR FIRE PROTECTION SYSTEMS
Egress components and fire protection systems that may be negatively impacted by yoru scope of work will be required to comply with the currently adopted fire code. As an example, if your work increases the occupant load of a space, the existing egress components will be required to comply with the requirements of the new occupant load. |
| Attention | (STANDARD COMMENT) CONSTRUCTION SPLICES
You are strongly encouraged to have any splices that may occur during this project, reviewed by CSFD. Failure to do so, can result in coordination issues that could prevent a final inspection from being completed, thus delaying the issuance of a Certificate of Occupancy.
|
| Attention | (STANDARD COMMENT) FIRE EXTINGUISHERS
PLAN REVIEWS DO NOT INCLUDE REVIEW OF TYPE, SIZE OR PLACEMENT OF FIRE EXTINGUISHERS.
|
| FYI | (STANDARD COMMENT) WATER SUPPLY REQUIRED ON SITE
Required water supplies for fire protection, either temporary or permanent, shall be made available as soon as combustible material arrives on the site. (2009 1412) |
| FYI | (STANDARD COMMENT) FIRE FLOW TEST RESULTS REQUIRED - EXISTING HYDRANTS:
Actual hydrant flow test results dated within 5 years shall be provided prior to the arrival of combustible material on the construction site. |
| FYI | *****(STANDARD COMMENT) HYDRANT REQUIREMENTS:
On site theoretical fire flows are -2000- gpm where -2500- gpm required;
On site number of hydrant(s) are -ADEQUATE
NOTE: The fire flow requirements are intended for any buildng, regardless of furnishing or interior use. this building poses minimal need for fire flow in it's intended usage as an equetrian arena. the floor is dirt and the structure is red iron with metal skin with possible panels along sides to prevent injuries to animals. A fire flow of 2000 gpm is deemed adequate for this facility. |
| FYI | (STANDARD COMMENT) FIRE EXTINGUISHERS
Fire Extinguishers shall be provided in accordance with Section 906 of the 2009 IFC.
Install extinguishers in highly visible and accessible locations, never in a dead-end area, and always try to place them near an exit pathway or at an exit(s). Mount 4" off floor to a maximum of 5 ft. to the top of the fire ext. (HINT: About waist high is perfect.) "FIRE EXTINGUISHER" signs may need to be posted to properly identify where the units are located if they're not highly visible.
|
| FYI | *****(STANDARD COMMENT) OCCUPANT LOAD
THE OCCUPANT LOAD FOR THIS FACILITY IS: 498
The occupant load, calculated by the Regional Building Department shall be posted in a visible location. This determined number shall not be exceeded under any circumstance.
|
| FYI | (STANDARD COMMENT) ASSEMBLY OCCUPANCIES
The following is a list of concerns to be aware of for Assembly Occupancies:
Fire Hydrants
Fire Lanes
Fire Sprinkler
Door locking hardware
Knox Box
Occupant Load Signs
|
| FYI | (STANDARD COMMENT) EXIT SIGNS AND EMERGENCY LIGHTING:
Exit Signs and Emergency Lighting shall be in compliance with the adopted building and fire code.
Paths of egress will be verified to be compliant, even if they are beyond the scope of work. If your scope of work impacts the means of egress, i.e. a new conference room - the path of egress beyond that scope of work will be verified to make sure occupants can safely egress the building. |
| FYI | (STANDARD COMMENT) LOCKING HARDWARE:
All locking and latching devices shall comply with the requirements of the adopted building and fire code. |
| FYI | (STANDARD COMMENT) HIGH PILED-NOT APPROVED
This facility will not be permitted to stock over 12 feet, and proper "NO STACKING OVER 12' " signs must be posted throughout the warehouse/stock room as per CSFD requirements. |
| Attention | *****(STANDARD COMMENT) FIRE PROTECTION SYSTEMS
The following systems are present or required in this facility:
--XXX---Fire Alarm System
-XXX----Water-Based Suppression System (fire sprinklers, standpipes, etc)
Applicable Fire Protection System plans shall be submitted to the CSFD Construction Services office in the Regional Development Center.
|
| FYI | (STANDARD COMMENT 10) INSPECTIONS
Due to the dynamic nature of inspectors schedules, PLEASE call your inspection requests in with ample time to allow scheduling.
When calling, please have your complete CSFD plan review number(s) ready for each inspection request.
( i.e. 20001234 - HM -2 or 20000012 - CN - 1)
The CSFD Approved sets of plans are to be on site for all inspections. |
| FYI | (STANDARD COMMENT) JAH - SCHEDULING INSPECTIONS:
Your assigned inspector is Jeff Hanenberg. Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities.
|
| FYI | (STANDARD COMMENT) REVIEWS
Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents.
The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.
(105.4.4)
|
| FYI | (STANDARD COMMENT) PERMITS
Insure all applicable permits are obtained from the Regional Building Department and the Colorado Springs Fire Department for the work that is being done at this site.
|
| 9/14/2012 |
FYI | *****(STANDARD COMMENT) This project is: Penrose Equestrian Center, 1045 Lower Gold Camp Rd: addition to arena
Date of Plans: 8.30.12
You can access our web site for the latest fire department plan review comments:
1. From www.pprbd.org, select PLAN REVIEW then FIND PLANS next COLORADO SPRINGS
2. Scroll down to the correct address. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
|
| FYI | *****(STANDARD COMMENT) HYDRANT REQUIREMENTS:
Size of Bldg. -50,832- sq ft
Construction Type -II-B-
Fire Sprinklers Y-XXX- N--
Required GPM: -2500- gpm
# of hydrant(s) required: -3-
Max AVG spacing between hydrants: 450-- ft
Max hose lay: -225- ft
|
| Disapproved | *****(STANDARD COMMENT 19) DISAPPROVED COMMENTS
The following information and/or corrections are needed prior to completing a full plan review. Please respond, in writing on letterhead, to each of the following comments:
1. Questions regarding the occupancy and occupant load must be answered before we can complete a throrough review.
2. Code study and Plans set must coordinate with the information provided between them (ie match).
3. Please provide fire flow information on existing hydrants to verify adequate fire flow is provided for the new area.
This appears to be fairly straight forward and I don't foresee any major issues holding up approval once these items are addressed.
Also review the disapproved plans for additional written comments prior to submittal of new plans. |
| Disapproved | (DISAPPROVED) FIRE FLOW REPORT
Provide confirmation on the fire flow results from Colorado Springs Utilities. A copy of their report for this area is required to be provided with your plan submittals.
When multiple fire flows are provided from CSU, please indicate all flows on your submitted plans.
NOTE - To request a fire flow report, please go to: http://www.csu.org/business/businesswithus/documents/item10501.pdf
|
| FYI | (STANDARD COMMENT) CORRECTIONS
All corrections and comments are to be submitted back to CSFD in writing, or provid submittal sheets/drawings, etc as requested, to complete the review. Corrections are not accepted over the phone, via fax or verbally.
|
| Attention | (STANDARD COMMENT) THE DISAPPROVED ITEMS MAY NOT CONSITITUE A COMPLETE LIST OF VIOLATIONS.
IT IS THE RESPONSIBILITY OF THE DESIGNER/ARCHITECT TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE ADOPTED CODES/STANDARDS AND INCORRECT INFORMATION PRIO TO RESUBMITTING.
|
| FYI | (STANDARD COMMENT) RESUBMITTALS
Re-reviews may be submitted back to the CSFD by direct submittal at the Construction Services counter, or through the Regional Building Department's routing system.
|
| FYI | (STANDARD COMMENT) REVIEWS
Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirements are met as established by the Authority Having Jurisdiction, whether or not the requirements are specifically indicated on the submitted construction documents.
The CSFD has reviewed the submittal in accordance with the adopted fire code requirements, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code.
(105.4.4)
|