RSS | Advanced Search | Site Map | Text Size a- A+
City of Colorado Springs
We Create Community

NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

STEAK N SHAKE - MAIN
01560 BRIARGATE BL

Review DateStatusComment(s)
11/26/2012 FYI*****(STANDARD COMMENT 1) This project is: Steak N Shake, 1560 Briargate Boulevard: new restaurant Date of Plans: 10.2.12 You can access our web site for the latest fire department plan review comments: 1. From www.pprbd.org, select PLAN REVIEW then FIND PLANS next COLORADO SPRINGS 2. Scroll down to the correct address. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
FYI*****(STANDARD COMMENT) SCOPE OF WORK: ---XXX--UTILITY SERVICE PLAN --XXX--FIRE/DOMESTIC -
FYI*****(STANDARD COMMENT) FIRE FLOW/HYDRANT REQUIREMENTS MET: On this site the theoretical water flows are --2600-- gpm, and the numbers of hydrant(s) are ---1-. This site, based upon the provided theoretical modeled fire flows, appear to meet the minimum flow requirements and/or the number of hydrant(s) for this structure.
FYI*****(13) FIRE DEPARTMENT CONNECTION: FDCs shall be located in a CSFD approved location. The FDC shall be located on the front entrance and/or addressed side of the structure, fully visible and recognizable from the street. FDCs shall be location such that it is not blocked by any means or located behind parked vehicles and such that fire apparatus and hoses connected to the FDC do not obstruct access to building for other fire apparatus. FDCsshall be located within 40-ft of an approved fire department access road. There shall be a fire hydrant capable of supplying the fire flow requirements for the sprinkler system within 100 feet of the FDC. FDCs shall be mounted not less than 18-inches and not more than 4-foot above the level of the adjacent grade or access level. (NFPA 14:6.4.6) NOTE - FLUSH MOUNTED FDC SPECIFIED
FYI(STANDARD COMMENT 8) GENERAL INSPECTIONS/PLANS & SCHEDULING Minimum notice of one week is required for all inspections. PLEASE plan ahead - call your inspections in with ample time to allow adequate scheduling. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( For Example: 2005-1234- HS-2) The CSFD APPROVED sets of plans SHALL be on site for all inspections.
FYI(STANDARD COMMENT) SCHEDULING INSPECTIONS: Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities.
FYI(STANDARD COMMENT) REVIEWS: Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirement are met as established by the Authority Having Jurisdiction, whether of not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the fire code requirements of the 2003 International Fire Code, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)
9/19/2012 FYI*****(STANDARD COMMENT 1) This project is: Taste of India, 750 Citadel Dr E, Suite 2264: kitchen suppression system only Date of Plans: 9.10.12 You can access our web site for the latest fire department plan review comments: 1. From www.pprbd.org, select PLAN REVIEW then FIND PLANS next COLORADO SPRINGS 2. Scroll down to the correct address. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
Attention*****(STANDARD COMMENT 2) BUILDING DATA: Size of Bldg. ---3315-- sq ft Construction Type ---V-B--- Fire Sprinklers Y--XXX--- N----- Required GPM: ---1500-- gpm # of hydrant(s) required: --1--- Max AVG spacing between hydrants: ----500- ft Max hose lay: ---250-- ft
FYI*****(STANDARD COMMENT) SCOPE OF WORK: --XXX---UTILITY SERVICE PLAN ---XXX--FIRE/DOMESTIC -
DisapprovedDISAPPROVED The following information and/or corrections are needed prior to completing a full plan review: 1. Verify the location of the gas meter and the fire line do not conflict with each other. 2. without showing the existing fire hydrants, it is impossible to assist with the location of the FDC. Additionally, the fire flow report (theoretical) must be provided for any new structures - see additional comments. Also: 1) Review all redline comments and address each one. 2) Return ALL red lined plan sets for each re-review.
Disapproved(DISAPPROVED) FIRE FLOW REPORT Provide confirmation on the fire flow results from Colorado Springs Utilities. A copy of their report for this area is required to be provided with your plan submittals. When multiple fire flows are provided from CSU, please indicate all flows on your submitted plans. NOTE - To request a fire flow report, please go to: http://www.csu.org/business/businesswithus/documents/item10501.pdf
Disapproved(DISAPPROVED) FIRE DEPARTMENT CONNECTION Your plans do not indicate, or have placed the Fire Department Connection (FDC) to the sprinkler systems in an unacceptable location.
FYI(STANDARD COMMENT) REVIEWS: Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirement are met as established by the Authority Having Jurisdiction, whether of not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the fire code requirements of the 2003 International Fire Code, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)


 

Contact Us: Email Us - Call: 385-CITY (719-385-2489) - RSS - Privacy, Linking and ADA Policies - designed, developed by projecta.com

printer friendly version Printer friendly version