NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING. System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.
SALVATION ARMY HOMELESS SHELTER 00709 SIERRA MADRE ST
| Review Date | Status | Comment(s) |
| 10/19/2012 |
FYI | ***** 5-DEVICE LETTER:
Date Submitted: 10/18/12
Date of Work: 10/19/12
Contractor: ESI
Scope : Replace 2 horn/strobes and remove 2 smoke detectors
Current Draw: 8.355648AH
Battery Size: 12V/12AH
Location of work: Bathroom, kitchen
Bldg permit #: I41443
|
| 10/18/2012 |
Disapproved | ***** 5-DEVICE LETTER DISAPPROVALS:
-----Multiple letters have been submitted for this scope of work/building permit, thus the total modifications exceed 5 devices.
-----Your company is currently restricted from use of this privilege through a ruling from Fire Board of Appeals.
-----Your company is currently not licensed to perform work on fire suppression systems, please contact Contractor Licensing at 719-327-2880 to correct this.
---XX--The information you have provided is not complete, please provide the following:
There is still no drawing included with re-submittal
|
| 6/15/2012 |
Disapproved | ***** 5-DEVICE LETTER DISAPPROVALS:
--XXX---The information you have provided is not complete, please provide the following:
Sketch showing scope of work
Building permits are required for new walls and restrooms - this letter can't be approved until we ahve approved the associated building permit work.
|
|