NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING. System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.
WELLPOINT 00555 MIDDLE CREEK PY
| Review Date | Status | Comment(s) |
| 10/17/2012 |
FYI | ***** 5-DEVICE LETTER:
Date Submitted: 10/17/12
Date of Work: 10/18/12
Contractor: WSFP
Scope : Relocate existing horn/strobe (per CSFD write up)
Current Draw: 23.759 AH
Battery Size: 12V/25AH
Location of work: 4th floor Wellpoint tenant space
Bldg permit #: I20744
|
| 10/5/2012 |
Disapproved | ***** 5-DEVICE LETTER DISAPPROVALS:
--XX---The information you have provided is not complete, please provide the following:
No current battery calcs submitted.
|
| 10/3/2012 |
FYI | ***** 5-DEVICE LETTER:
Date Submitted: 10/02/12
Date of Work: 10/04/12
Contractor: WSFP
Scope : Relocate one horn strobe
Current Draw:
Battery Size:
Location of work: Ste 400
Bldg permit #:I20744
|
|