| Review Date | Status | Comment(s) |
| 10/26/2009 |
FYI | *****(STANDARD COMMENT 1) This project is: Restroom Facility, 715 Prospect Lake Dr: New precast restroom
You can access our web site for the latest fire department plan review comments:
1. From www.pprbd.org, select "RELATED WEB SITES" in the upper right corner.
2. Click on Colorado Springs FIRE PREVENTION.
3. Then select VIEW PLAN REVIEW STATUS.
4. Scroll down to the correct address.
5. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
|
| FYI | (STANDARD COMMENT 4) RE-REVIEWS (commercial construction plans only)
Re-reviews may be submitted back to the CSFD by direct submittal at the Construction Services counter, or through the Regional Building Department's routing system.
|
| Disapproved | (STANDARD COMMENT 10) DEVELOPMENT PLAN
Attach copies of the "City Approved" development plan to each set of construction plans submitted to the Colorado Springs Fire Department for review.
|
| Disapproved | (STANDARD COMMENT 15) WATER PLANS
The City APPROVED" fire hydrant and water main plans are to be ATTACHED to all sets of construction plans for CSFD plan reviews.
|
| FYI | (STANDARD COMMENT 16) EXISTING HYDRANTS
If it is felt that the existing fire hydrants will provide adequate fire flow and will be the correct number of required hydrants, the applicant will need to contact Keta Donegan with COLORADO SPRINGS UTILITIES at (719) 668-8733 or by FAX at (719) 668-5651 to request a theoretical fire flow calculation and fire hydrant location map.
Keta will need the following information to process your request:
1) Gross square footage of the structure (including all floor levels, basements, and attached canopies)
2) Type of construction determined by the Regional Building Department
3) Requesters name
4) Requestors company name
5) Phone and fax numbers of the requestor
6) Project address
7) Project cross streets
8) Public Hydrant numbers of the closest fire hydrants (you can find this number in white lettering on top of the hydrant)
ATTENTION: ALLOW A MINIMUM OF 3 DAYS FOR ALL FIRE FLOW CALCULATIONS
|
| Disapproved | *****(STANDARD COMMENT 17) HYDRANT REQUIREMENTS:
Size of Structure (gross square footage) -568- sq ft;
Type of construction -V-B-;
Is building sprinkled Y -- N -XXX-;
GPM requirements -1500- gpm;
Number of hydrant(s) required; -1-
Max. spacing between hydrants -500- ft;
Max. hose lay -250- ft;
|