NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING. System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.
CTI 01096 ELKTON DR
| Review Date | Status | Comment(s) |
| 11/12/2009 |
Attention | Kay - please get a No Stacking form from these guys as well - that slipped through the CN review. |
| 10/30/2009 |
FYI | This project is Office Warehouse, 1096 Elkton Dr: fire service line for sprinkler retrofit, Suite 170, Interior Remodel
SYSTEMS: fire sprinklers
CN:Code:03 IBC - 03 IFC - 05 PPRBC /Class: UNK / Const: II-B /Stories: /Size: 46,400 /OL: UNK
FH:Required Flow: 2250 gpm /# Hydrants 2 /On site flow:
You can access our web site for the latest fire department plan review comments:
1. From www.pprbd.org, select "RELATED WEB SITES" in the upper right corner.
2. Click on Colorado Springs FIRE PREVENTION.
3. Then select VIEW PLAN REVIEW STATUS.
4. Scroll down to the correct address.
5. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
Total square feet of this project is 24880
This project consists of: 8072 sq ft of "B"/ 13421 of "F-1"/ 3227 of "S-2"
Hazmat review for interior remodel. |
| Disapproved | Note: the Pikes Peak Regional Building Code Study form was not completed for hazardous materials; and has not addressed the storage and use of hazardous materials.
This facility is a manufacturer of ink product goods and identifies materials or processes on the plan sheets, such as, slurry storage, shop, barrel rack storage, 5 gallon storage, etc., which indicate the potential presence of hazardous materials.
Please address whether the remodel will impact existing or introduce new hazardous materials or increase/decrease hazardous materials or affect locations of storage and use. See additional comments below. (1) Provide your response in narrative format, (2) provide a chemical inventory (attached to plan resubmittal), (3) scope of work, manufacturing or process description for this facility and (4) complete the Hazardous Materials Amount Certification Form attached to this plan set, resubmit to the CSFD.
If this facility stores or uses hazardous materials in amounts above the permit threshold then complete an application for an Annual Operational permit on the CSFD web based online permit program at:
http://csfd.springsgov.com/hamish/. |
| Disapproved | INCOMPLETE SUBMITTAL - Currently, your submittal is incomplete. No hazardous materials information was provided with this plan submittal.
In order to provide an adequate review of your proposal, please ensure that all of the following items have been submitted. Failure to do so may result in delays of your plan review.) The following items must be provided to the CSFD PRIOR IN ORDER TO COMPLETE THIS PLAN REVIEW AND PRIOR TO requesting your fire finals for occupancy.
The storage, use and/or dispensing of hazardous materials within this facility shall be in accordance with all applicable provisions of the 2003 International Fire Code, as amended.
1) Provide a scope of work and describe the chemicals, commodities, hazardous materials impacted by this project/remodel. All hazardous materials and inventory shall be reported the in the CSFD HAMISH PROGRAM ON LINE AT http://csfd.springsgov.com/hamish/.
The annual operation hazmat permit is automatically renewed, annually. |
| Disapproved | INCOMPLETE SUBMITTAL CONTINUED
*** THE CHEMICAL INVENTORY SHALL BE REPORTED IN THE CSFD HAMISH PROGRAM ON LINE AT http://csfd.springsgov.com/hamish/
*** PROVIDE THE CHEMICAL INVENTORY AND PRINTOUT HARD COPY WITH THE CONSTRUCTION PLANS RESUBMITTAL.
*** Contact Kay Yeager, Hazardous Materials Coordinator/Plan Reviews for questions at 719-385-7356 or the OFM main office at 719-385-5978.
*** Report all chemicals, hazard classification, and quantities, individual and aggregate; see Hamish website.
IMPACTED BY THIS PROJECT.
Are there changes in location of storage?
Increase or decrease in quantities?
Adding or eliminating hazardous materials?
Are there impacts on hazardous materials and locations stored/used and quantities?
*** Identify CONTROL AREAS at this facility per the IBC and IFC 2003.
*** Is this facility or portions of this facility an "H" occupancy? |
| FYI | RESPONSIBILITY: Our reviews are based upon and limited to the information presented on the drawings and/or the specific materials submitted. Matters not presented within the construction documents submitted, nor items not requested for review, which are required for the granting of permits by the CSFD, are assumed to be reviewed and inspected by others, and not to be considered as part of this review unless noted otherwise herein. No responsibility or duty is accepted, implied, or extended to, for, and/or resulting from construction in any phase, form or manner.
The review of these plans does not relieve the architect, contractor, or building owner from designing and building the structure per nationally recognized good standards, and all code and standard requirements. Code and standard requirements are not necessarily noted on the plans, in the plan review comment sheets, or not noted during inspections are still required to be provided and installed so that the building construction is installed in full compliance with all applicable codes and standards.
We have reviewed the submittal in accordance with the fire code requirements of the 2003 International Fire Code, CSFD local amendments, City Code Standards, applicable NFPA Standards, and using good fire protection practices. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. |
| FYI | CORRECTIONS. All corrections and comments are to be submitted back to CSFD in writing, or provide submittal sheets/drawings/ blueprints etc. as requested, to complete the review. Corrections are not accepted over the phone, via fax, or verbally. |
|