NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

THE ROCK CLIMBING CENTER
00021 NEVADA AV

Review DateStatusComment(s)
11/12/2009 IThe fire alarm plans indicated there could be a problem with EXIT access in the vicinity of the "wall". The fire alarm plans indicate that there will be tunnel access. The inspector should ensure that all aspects of these accessways meet with EXITing requirements.
9/24/2009 FYI*****(STANDARD COMMENT 1) This project is: The Rock Climbing Center, 21 N Nevada Av: interior remodel - change of use from A to mixed A2/A3 You can access our web site for the latest fire department plan review comments: 1. From www.pprbd.org, select "RELATED WEB SITES" in the upper right corner. 2. Click on Colorado Springs FIRE PREVENTION. 3. Then select VIEW PLAN REVIEW STATUS. 4. Scroll down to the correct address. 5. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
FYI(STANDARD COMMENT 82) FIRE PROTECTION SYSTEM PLANS Applicable Fire Protection System (fire alarm, fire sprinkler, fixed fire) plans shall be submitted to the CSFD Construction Services office in the Development Review Enterprise at the Regional Development Center 2880 International Circle
FYI*****(STANDARD COMMENT 102) The plans have been resubmitted and all the disapproved comments have been addressed and/or corrected as follows: 1. A manual fire alarm system will be installed per these plans.
9/17/2009 FYI*****(STANDARD COMMENT 1) This project is: The Rock Climbing Center, 21 N Nevada Av: interior remodel - change of use from A to mixed A2/A3 You can access our web site for the latest fire department plan review comments: 1. From www.pprbd.org, select "RELATED WEB SITES" in the upper right corner. 2. Click on Colorado Springs FIRE PREVENTION. 3. Then select VIEW PLAN REVIEW STATUS. 4. Scroll down to the correct address. 5. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
FYI(STANDARD COMMENT 2) REVIEWS: Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirement are met as established by the Authority Having Jurisdiction, whether of not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the fire code requirements of the 2003 International Fire Code, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD.
Disapproved(STANDARD COMMENT 100) PLANS DISAPPROVED: The following information and/or corrections are needed prior to conducting a full plan review 1. A fire alarm system is required for this faciltiy, please indicate on the plans whether it is existing or if a new system will be installed. All corrections and comments shall be submitted back to CSFD in writing, or provide submittal sheets/drawings/ blueprints etc. as requested, which will allow us to complete our review. We do not accept plan review corrections over the phone, via fax, or verbally.
FYI(STANDARD COMMENT 3) PERMITS Insure all applicable permits are obtained from the Regional Building Department and the Colorado Springs Fire Department for the work that is being done at this site.
FYI(STANDARD COMMENT 4) RE-REVIEWS (commercial construction plans only) Re-reviews may be submitted back to the CSFD by direct submittal at the Construction Services counter, or through the Regional Building Department's routing system.
FYI(STANDARD COMMENT 22) FIRE EXTINGUISHER - COMMERCIAL BUILDINGS A "2A -10B:C" fire extinguisher is to be installed in LOW TO MODERATE HAZARD OCCUPANCIES at a rate of 1 unit per 3,000 square feet, AND a maximum of a 75-ft travel distance to an extinguisher. Remember that all extinguishers must be installed in highly visible and accessible locations, never in a dead-end area, and always try to place them near an exit path-way or at an exit(s). Mount 4" off floor to a maximum of 5 ft. to the top of the fire extinguisher. (HINT: About waist high is perfect) ATTENTION: "FIRE EXTINGUISHER" signs may need to be posted to properly identify where the units are located if they're not highly visible.
FYI(STANDARD COMMENT 41) KNOX (TM) ENTRY FOR EXISTING BUILDINGS Existing KNOX (TM) Box shall be updated to provide a minimum of 2 sets of labeled keys for all doors and tenants.
FYI*****(STANDARD COMMENT 50) OCCUPANT LOAD THE OCCUPANT LOAD FOR THIS FACILITY IS: 397 The occupant load, calculated by the Regional Building Department shall be posted in a visible location. This determined number shall not be exceeded under any circumstance.
FYI(STANDARD COMMENT 82) FIRE PROTECTION SYSTEM PLANS Applicable Fire Protection System (fire alarm, fire sprinkler, fixed fire) plans shall be submitted to the CSFD Construction Services office in the Development Review Enterprise at the Regional Development Center 2880 International Circle
FYI(STANDARD COMMENT 90) INSPECTIONS A minimum of a 2-business day notice is required for all inspections. Please have your eight digit "Fire Department Plan Review Number" ready when calling to schedule an inspection.
FYI(STANDARD COMMENT 93) SCHEDULING INSPECTIONS INSPECTOR JOHNSON: STATIONS 1, 2, 3, 4, 5, 9, 13, 16 Colorado Springs Fire Department Inspectors schedule their own inspections. Based upon geographic location of this project, your assigned Inspector is Kris Johnson. You may contact him at 719-385-7257 to schedule all construction related inspection activities. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( i.e. 2005-1234-CN-1 or 2005-0012-SP-1)
Attention(STANDARD COMMENT 101) THE DISAPPROVED ITEMS MAY NOT CONSITITUE A COMPLETE LIST OF VIOLATIONS. IT IS THE RESPONSIBILITY OF THE DESIGNER/ARCHITECT TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE ADOPTED CODES/STANDARDS AND INCORRECT INFORMATION PRIO TO RESUBMITTING.


 

Contact Us: Email Us - Call: 385-CITY (719-385-2489) - RSS - Privacy, Linking and ADA Policies - designed, developed by projecta.com

printer friendly version Printer friendly version