NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

CHICK FIL A - MAIN
00575 GARDEN OF THE GODS RD

Review DateStatusComment(s)
10/6/2009 FYI*****(STANDARD COMMENT 1) This project is: Chick-Fil-A - 575 W. Garden of the Gods ATTENTION: See our web site for our latest plan review comments for your job at: www.springsgov.com - go to "City Agencies" (tab on the teal bar to get a drop box) - click on - "Fire Department" - (Using the links down the left side of the page), click on - "Web Guide." Once you're into the Web Guide, click on "Plan Review Status" This will also give you access to numerous other items that may assist you in your future project design work.
FYI*****(STANDARD COMMENT 5) The special hazard suppression system is being installed by: SGFP This plan review is based on the requirements found within the 2003 editions of the International Building Code, International Fire Code and the most recent editions of the NFPA standards as applicable.
FYI*****(STANDARD COMMENT 6) SPECIAL HAZARD SUPPRESSION SYSTEM DESIGN: Type of System: Ansul R-102 Wet Chemical Size of System: 12 Gallon Hazard Protected: 3 interconnected hoods in kitchen
Attention*****(STANDARD COMMENT 7) NOTE NOTE - The following RED-LINED items are to be corrected prior to final inspection: 1) Title Page to have "System Size in Gallons" added (red-lined) on approved plans on site at time of inspection. 2) Duct size & protection on cover page does not appear to match drawing. Please provide correct size and/or correct nozzle. Also adjust flow point counts accordingly. Corrections (red-lined) on approved plans prior to FINAL inspection. 3) At time of FINAL, include scaled drawing showing distances between hoods so pipe length can be figured. 4) At FINAL inspection, installer will be able to demonstrate that piping length, "T's" and "90% elbows" are within manufacturer's specs. Have manual on site so inspector can verify.
FYI(COMMERCIAL COOKING OPERATIONS) APPLIANCE RESTRAINT: Moveable cooking appliances shall be provided with a means to ensure proper positioning in related to the appliance discharge nozzle during cooking operations. (NFPA 17A 5.6.4; NFPA 96: 12.1.2.3.1)
FYI(COMMERCIAL COOKING OPERATIONS) FUEL SHUT-OFF: Interconnection of the suppression system, fuel and/or current supply shall be arranged to shut off all cooking equipment AND electrical receptacles located under the hood when the suppression system is actuated. Where systems protect hazards that are normally heated, the power or fuel supply to heaters shall be shut off automatically upon actuation of the extinguishing systems. Where systems protected hazards that have flowing flammable or combustible fluids or gases, the system shall be provided with automatic means to ensure shutoff of power and fuel valves upon operation of the extinguishing systems. All shutoff systems shall require manual resetting. (IFC 904.11.2; NFPA 17A: 4.4.3 and 9.3.5)
FYI(COMMERCIAL COOKING OPERATIONS) APPLIANCE SEPARATION: All deep-fat fryers shall be installed with at least a 16-inch space between the fryer and surface flames from adjacent cooking equipment and not less than 3' from solid fuel cooking equipment. Exception: Where a steel or tempered glass baffle is installed at a minimum of 8-inches in height between the fryer and surface flames of the adjacent appliance; if the fryer and the surface planes are at different horizontal planes, the 8-inch height shall be measured from the higher of the two appliances. (NFPA 96: 12.1.2.4-5)
FYI(COMMERCIAL COOKING OPERATIONS) FUSIBLE LINKS: Fusible links shall be provided within each exhaust duct opening and above each protected cooking appliance in accordance with the manufacturer's listing. (NFPA 17A 5.6.1.5-6)
FYI(COMMERCIAL COOKING APPLIANCES) EXHAUST FANS: Upon activation of the fire suppression system, the exhaust fan shall remain on while the make-up air is shut down. (2003 IFC 904.11.6.1.1 as amended).
FYI(COMMERCIAL COOKING OPERATIONS) COMMON EXHAUST DUCT: Common exhaust ducts shall be protected by one of the following methods: 1. Simultaneous operation of all independent hood, duct, and appliance protection systems OR 2. Simultaneous operation of any hood, duct, and appliance protection system and the system(s) protecting the entire common exhaust duct. (NFPA 17A: 5.6.2)
FYI(COMMERCIAL COOKING OPERATIONS) MAKE-UP AIR: If mechanical make up air for the hood system is being provided through the hood, the mechanical make up air shall shut off upon activation of the fire extinguishing system, if exhaust fans shut down. (NFPA 96:8.3.2)
FYI(COMMERCIAL COOKING OPERATIONS) FIRE EXTINGUISHERS: Class K portable extinguishers are required within the City of Colorado Springs for all commercial kitchens equipped with wet chemical fixed fire suppression systems. Extinguishers shall be installed within 30 feet of appliances, as measured along an unobstructed path of travel. (IFC 904.11.5)
FYI(COMMERCIAL COOKING OPERATIONS) SIMULTANEOUS OPERATION: Systems protection two or more hoods and/or plenums shall be installed to ensure the simultaneous operation of all systems protecting the hoods, plenums and associated appliances below the hood(s). (NFPA 17A: 5.6.1)
FYI(STANDARD COMMENT) INDICATION OF SYSTEM ACTIVATION: An audible OR visual indication shall be provided that the system has operated, that personnel response is needed, and that the system is inneed of recharge. (IFC 904.3.4; NFPA 17:5.7.3; NFPA 17A: 5.2.1.8)
FYI(STANDARD COMMENT) FIRE ALARM SYSTEM CONNNECTIONS: The extinguishing system shall be connected to the fire alarm system, if provided, in accordance with NFPA 72. (IFC 904.3.5)
FYI(STANDARD COMMENT) MANUAL PULL STATIONS: A readily accessible means for manual activation shall be installed at an approved location in the path of egress. Pull stations for multiple system shall be installed in the same location. All manual pull stations shall be permanently and clearly identified as to the hazard and/or system they protect. (IFC 904.11.1; 2002 NFPA 17:5.7.1.7; 17A 4.4.2.5 and 5.2.1.10; 2001:4.3.3.6, 4.3.3.10)
FYI(STANDARD COMMENT) NOZZLES: All discharge nozzles shall be provided with caps or other suitable devices to prevent the entrance of grease, vapors, moisture or other foreign materials into the piping. (NFPA 17: 4.3.1.5; NFPA 17A 4.3.1.5; 2001:4.2.5.4)
FYI(STANDARD COMMENT) MULTIPLE HAZARDS: Where two or more hazards can be simultaneously involved in fire by reason of their proximity, they shall be protected by one of the following methods: 1. Individual systems installed to operate simultaneously OR 2. A single system designed to portect all hazards that can be simultaneously involved. (NFPA 17:5.2.1; NFPA 17A: 5.1.5)
FYI(STANDARD COMMENT 8) CERTIFICATE OF INSTALLATION: Attached to these approved plans is the "Certificate of Installation". It is the installer's responsibility to certify through this form that the system has been properly installed and tested. The form is to be filled out in its entirety PRIOR TO THE ARRIVAL OF THE FIRE INSPECTOR that is conducting the final inspection and/or the acceptance test of the system. FINAL INSPECITONS WILL NOT BE CONDUCTED WITHOUT THIS FORM BEING COMPLETED.
FYI(STANDARD COMMENT 9) MANUFACTURER'S DATA The approved set of extinguishing system plans, manufacture's product data sheets on all equipment being installed, and the installation permit are to be on site for all fire department inspections.
FYI(STANDARD COMMENT 10) INSPECTIONS A minimum of 2-business days notice is required for all inspections. Please have your eight digit "Fire Department Plan Review Number" ready when calling to schedule an inspection. This number can be obtained from the General Contractor and/or is found in a blue stamp on the front or the back of the approved set of plans.
AttentionATTENTION CONTRACTORS: Starting October 3rd, 2005 all construction related fire inspections will be scheduled through an assigned inspector. Your assigned inspector is as indicated below. Please contact them to schedule any inspection to take place on or after October 3rd.
FYI(STANDARD COMMENT) KHJ - SCHEDULING INSPECTIONS: Starting October 3, 2005, Fire Inspectors will be scheduling their own calendars. Your assigned Inspector is Kris Johnson. You may contact him at 719-385-7257 to schedule all construction related inspection activities
IThe following information and/or corrections are needed prior to completing a full plan review. Please respond, in writing, to each of the following comments: Also review the disapproved plans for additional written comments prior to submittal of new plans. 1) Title Page to have "System Size in Gallons" added 2) Duct size & protection on cover page does not appear to match drawing. Please provide correct size and/or correct nozzle. Also adjust flow point counts accordingly. 3) When resubmitting, include scaled drawing showing distances between hoods so pipe length can be figured. ********************************* See Standard comment 7 for red-lined items to be corrected prior to and verified at time of FINAL.
AttentionNOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.


 

Contact Us: Email Us - Call: 385-CITY (719-385-2489) - RSS - Privacy, Linking and ADA Policies - designed, developed by projecta.com