NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

CSFD FIRE STATION 22
00711 COPPER CENTER PKWY

Review DateStatusComment(s)
1/6/2014 FYI*****(STANDARD COMMENT 1) This project is: CSFD Fire Station 22 711 Copper Center Py New Fire Station You can access our web site for the latest fire department plan review comments: 1. From www.pprbd.org, select PLAN REVIEW then FIND PLANS next COLORADO SPRINGS 2. Scroll down to the correct address. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
Attention*****(STANDARD COMMENT 2) BUILDING DATA: Size of Bldg. --9216--- sq ft Construction Type --V-B---- Fire Sprinklers Y--XX--- N----- Fire Walls Y ----- Rating ----- N --XX--- Required GPM: ---1500-- gpm # of hydrant(s) required: ---1-- Max AVG spacing between hydrants: ---500-- ft Max hose lay: --250--- ft
FYI*****(STANDARD COMMENT) SCOPE OF WORK: -----MAIN EXTENSION -----UTILITY SERVICE PLAN -----DOMESTIC ONLY - NO FIRE INSPECTION REQUIRED -----FIRE/DOMESTIC - --XX---WATER PLAN --XX---Site Specific -----Subdivision - No Fire Inspection Required
FYI*****(STANDARD COMMENT) FIRE FLOW/HYDRANT REQUIREMENTS MET: On this site the theoretical water flows are --4500-- gpm, and the numbers of hydrant(s) are --1--. This site, based upon the provided theoretical modeled fire flows, appear to meet the minimum flow requirements and/or the number of hydrant(s) for this structure.
FYI*****(STANDARD COMMENT) REVISION: Revision Sequence: Second Scope of Revision: Address code review comments Date of Revision: 12/12/13
FYI(STANDARD COMMENT 10) INSPECTIONS Please call 719-385-5982 Extension 2 to schedule all construction related inspection activities. You will need to schedule an inspection at the time of Framing and a final inspection near completion. Due to the dynamic nature of inspectors schedules, PLEASE call your inspection requests in with ample time to allow scheduling. When calling, please have your complete CSFD plan review number(s) ready for each inspection request. ( i.e. 2013-1234 - HS-1) The CSFD Approved sets of plans are to be on site for all inspections.
FYI(STANDARD COMMENT) DISAPPROVED ITEMS ADDRESSED: The plans have been resubmitted and all the disapproved comments have been addressed and/or corrected as follows: 1. New hydrant is as opposed to a CSU required "blow off" due to financial considerations. 2. Hydrant 1526T across Copper Center Py is 155' from proposed FDC. There is landscaping and parking blocking access if FDC moved to NW corner of structure. This arrangement is being allowed. 3. Existing hydrant to NE is PRIVATE and would require a dual use agreement. Distance to FDC is approximately 280'. 4. Nearest existing hydrant on Voyager is approximately 169' from FDC. In speaking to DEW this is not preferred but acceptable.
FYI(STANDARD COMMENT) REVIEWS: Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirement are met as established by the Authority Having Jurisdiction, whether of not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the fire code requirements of the 2009 International Fire Code, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)
12/30/2013 FYI*****(STANDARD COMMENT 1) This project is: CSFD Fire Station 22 You can access our web site for the latest fire department plan review comments: 1. From www.pprbd.org, select PLAN REVIEW then FIND PLANS next COLORADO SPRINGS 2. Scroll down to the correct address. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
Attention*****(STANDARD COMMENT 2) BUILDING DATA: Size of Bldg. --9216--- sq ft Construction Type ---V-B--- Fire Sprinklers Y--XXX--- N----- Fire Walls Y ----- Rating ----- N --XXX--- Required GPM: --1500--- gpm # of hydrant(s) required: -1---- Max AVG spacing between hydrants: --500--- ft Max hose lay: --250--- ft
FYI*****(STANDARD COMMENT) SCOPE OF WORK: -XXX----WATER PLAN ---XXX--Site Specific
DisapprovedDISAPPROVED The following information and/or corrections are needed prior to completing a full plan review: 1. What purpose is the proposed on-site hydrant serving with an existing hydratn approx 140 feet to the northeast? 2. Is the existing hydrant to the NE a private hydrant? If so, a private hydrant agreement will be needed for this to be considered as part of the external fire protection for this structure. 3. Where are the existing hydrants on Voyager in relation to this site? Also: 1) Review all redline comments and address each one. 2) Return ALL red lined plan sets for each re-review.
Disapproved(DISAPPROVED) FIRE FLOW REPORT Provide confirmation on the fire flow results from Colorado Springs Utilities. A copy of their report for this area is required to be provided with your plan submittals. When multiple fire flows are provided from CSU, please indicate all flows on your submitted plans. NOTE - To request a fire flow report, please go to: https://www.csu.org/Pages/construction-drawing-review.aspx
Disapproved(DISAPPROVED) FIRE DEPARTMENT CONNECTION Your plans do not indicate, or have placed the Fire Department Connection (FDC) to the sprinkler systems in an unacceptable location. FDCs shall be located in a CSFD approved location. The FDC shall be located on the front entrance and/or addressed side of the structure, fully visible and recognizable from the street. FDCs shall be location such that it is not blocked by any means or located behind parked vehicles and such that fire apparatus and hoses connected to the FDC do not obstruct access to building for other fire apparatus. FDCsshall be located within 40-ft of an approved fire department access road. There shall be a fire hydrant capable of supplying the fire flow requirements for the sprinkler system within 100 feet of the FDC.
FYI(STANDARD COMMENT) REVIEWS: Colorado Springs Fire Department construction reviews are based upon information provided on the drawings and/or the attached reference material. Issues or features that are not presented within the construction documents are assumed to be complaint with applicable codes/standards. It is the responsibility of the building owner to ensure that minimum code requirement are met as established by the Authority Having Jurisdiction, whether of not the requirements are specifically indicated on the submitted construction documents. The CSFD has reviewed the submittal in accordance with the fire code requirements of the 2009 International Fire Code, CSFD local amendments, City Code Standards, and applicable NFPA Standards. All plan review comments are subject to final on-site field inspections, and testing by the CSFD. Review and approval by the CSFD shall not relieve the applicant of the responsibility of compliance with the International Fire Code. (105.4.4)


 