NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

RUDYS RESTAURANT - MAIN
00315 31ST ST

Review DateStatusComment(s)
10/7/2009 FYIRESUBMITTED: The plans have been re-submitted, and the disapproved issues have been addressed as follows: APPROVED. **PLEASE NOTE** ALL COMMENTS FOUND ON PREVIOUS PLAN REVIEWS REMAIN ENFORCEABLE UNLESS OTHERWISE NOTED IN THIS REVIEW. 1) A Hazardous Materials Permit Amount Certification Form has been provided and declares that this facility is below permit threshold amounts. 2) A 300 to 450 lbs Carbon dioxide mini bulk vessel (below 6000 cf) for beverage dispensing will be installed exterior to the building in a service yard; plan sheet 101 for location. 3) Refrigerants are declared well below the threshold amounts. 4) Based on the restaurant Hazardous materials in use and storage the restaurant is not required to apply for an annual operational HMMP permit. However, the gas station/fuel dispensing portion of this facility will require a minimum of 2 PERMITS. 1) An underground storage tank application for permit shall be completed and submitted to the CSFD prior to all tank installations. 2) An Annual Operational Hazardous Materials Permit shall be applied for on the web based HAMISH permit program website @ http://eoc.springsgov.com/hamish/ Fuel dispensing service stations are required to be permitted by the IFC 2003, as amended.
9/3/2009 FYIRudys Texas Bar BQ Restaurant, 315 South 31st Street. SYSTEMS: Fire Sprinkler for area, Fire Alarm for OL CN:Code: 03 IBC - 03 IFC - 05 PPRBC /Class: A-2 / Const: V-B /Stories: 1/Size:7294 /OL: 379 FH:Required Flow: 1500 gpm /# Hydrants1 /On site flow: DV: Proposing a 6451sq ft restaurant, shop and fuel station. Additional Comments: Fuel Station canopy was NOT part of the CN-1 review since CN plans indicated it was a separate permit. THIS REVIEW IS FOR HAZARDOUS MATERIALS. ATTENTION: See our web site for our latest fire department plan review comments. From the Pikes Peak Regional Building Department web site (www.pprbd.org), select "RELATED WEB SITES" in the upper right corner. Click on Colorado Springs FIRE PREVENTION. Then select PLAN REVIEW STATUS, click VIEW PLAN REVIEW STATUS. Scroll down to the correct address. You may then select APPROVED/DISAPPROVED to view comments associated with that particular project.
AttentionNote: the Pikes Peak Regional Building Code Study form indicates that the scope of this project does NOT include Hazardous Materials. However, restaurants may have materials classified as hazardous materials that may include but not limited to: refrigerants for coolers and freezers and Carbon Dioxide cylinders used in beverage dispensing. Please resubmit plans with a declaration of all hazardous materials by classification and quantities. The declaration and report requirements are found on the CSFD HaMish website http://csfd.springsgov.com/hamish/ See additional comments below.
AttentionPlease review the attached Certification Form for hazardous materials use and storage at this facility. Declare whether this facility exceeds or does not exceed the permit threshold amounts; attach a chemical inventory list to this form. Provide listed information on the haz-mat permit amount certification form for all Use/Dispensing/Storage of Hazardous Materials and Flammable Liquids that will be used within this facility. Certification form is attached to these plans Forms and packets are also available at http://www.springsgov.com/Page.aspx?NavID=1094.
DisapprovedINCOMPLETE SUBMITTAL - Currently, your submittal is incomplete. No hazardous materials information was provided with this plan submittal. In order to provide an adequate review of your proposal, please ensure that all of the following items have been submitted. Failure to do so may result in delays of your plan review.The following items must be provided to the CSFD PRIOR IN ORDER TO COMPLETE THIS PLAN REVIEW AND PRIOR TO requesting your fire finals for occupancy. The storage, use and/or dispensing of hazardous materials within this facility shall be in accordance with all applicable provisions of the 2003 International Fire Code, as amended. 1) Provide a scope of work and describe the chemicals, commodities, hazardous materials impacted by this project. All hazardous materials and inventory shall be reported the in the CSFD HAMISH PROGRAM ON LINE AT http://csfd.springsgov.com/hamish/. *** THE CHEMICAL INVENTORY SHALL BE REPORTED IN THE CSFD HAMISH PROGRAM ON LINE AT http://csfd.springsgov.com/hamish/ *** PROVIDE THE CHEMICAL INVENTORY AND HMMP PRINTOUT HARD COPY WITH THE CONSTRUCTION PLANS RESUBMITTAL. *** Questions: Contact Kay Yeager, Hazardous Materials Coordinator/Plan Reviews for questions at 719-385-7356 or the OFM main office at 719-385-5978. *** Provide retail display with hazardous materials/chemical/commodities shown on site plans.
FYIRESPONSIBILITY: Our reviews are based upon and limited to the information presented on the drawings and/or the specific materials submitted. Matters not presented within the construction documents submitted, nor items not requested for review, which are required for the granting of permits by the CSFD, are assumed to be reviewed and inspected by others, and not to be considered as part of this review unless noted otherwise herein. No responsibility or duty is accepted, implied, or extended to, for, and/or resulting from construction in any phase, form or manner. The review of these plans does not relieve the architect, contractor, or building owner from designing and building the structure per nationally recognized good standards, and all code and standard requirements. Code and standard requirements are not necessarily noted on the plans, in the plan review comment sheets, or not noted during inspections are still required to be provided and installed so that the building construction is installed in full compliance with all applicable codes and standards. We have reviewed the submittal in accordance with the fire code requirements of the 2003 International Fire Code, CSFD local amendments, City Code Standards, applicable NFPA Standards, and using good fire protection practices. All plan review comments are subject to final on-site field inspections, and testing by the CSFD.
FYICORRECTIONS. All corrections and comments are to be submitted back to CSFD in writing, or provide submittal sheets/drawings/ blueprints etc. as requested, to complete the review. Corrections are not accepted over the phone, via fax, or verbally.


 

Contact Us: Email Us - Call: 385-CITY (719-385-2489) - RSS - Privacy, Linking and ADA Policies - designed, developed by projecta.com