| Review Date | Status | Comment(s) |
| 10/14/2009 |
FYI | *****(STANDARD COMMENT 1) This project is: Parking Garage, 10805 Hidden Pool Heights, NEW PARKING GARAGE
ATTENTION: See our web site for our latest plan review comments for your job at:
www.springsgov.com - go to "City Agencies" (tab on the teal bar to get a drop box) - click on - "Fire Department" - (Using the links down the left side of the page), click on - "Web Guide." Once you're into the Web Guide, click on "Plan Review Status" This will also give you access to numerous other items that may assist you in your future project design work.
|
| FYI | (STANDARD COMMENT 53 NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS.
THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.
|
| Disapproved | (STANDARD COMMENT 50) DISAPPROVED ITEMS
The following information and/or corrections are needed prior to conducting a full plan review:
1. Levels are not indicated on the standpipe/stair details. How do I determine if you are installing these on the correct level?
2. Per IFC 905.3.1 manaul dry standpipes shall be locatd so that all portions of the buiding are within 130 ft (30 feet of a nozzle attached to 100-ft of hose). Additional hose valves will be required.
Please note: a complete review could not be performed at the time of the first review due to the lacking required valves at the "bridges" from the cinema building.
At the second review, the hydraulics will not be reviewed at this time due to the need for more hose valves, which may have an impact on the hydraulics and which valves are the most hydraulically remote.
Also review the disapproved plans for additional written comments prior to submittal of new plans.
|
| 10/8/2009 |
FYI | *****(STANDARD COMMENT 1) This project is: Parking Garage, 10805 Hidden Pool Heights, NEW PARKING GARAGE
ATTENTION: See our web site for our latest plan review comments for your job at:
www.springsgov.com - go to "City Agencies" (tab on the teal bar to get a drop box) - click on - "Fire Department" - (Using the links down the left side of the page), click on - "Web Guide." Once you're into the Web Guide, click on "Plan Review Status" This will also give you access to numerous other items that may assist you in your future project design work.
|
| FYI | *****(STANDARD COMMENT 6) The fire standpipe system is being installed by: FIRE SYSTEMS WEST
This plan review is based on the requirements found within the 2003 Editions of the International Building Code, International Fire Code, and the 2007 edition of NFPA Standard 14.
|
| Disapproved | (STANDARD COMMENT 50) DISAPPROVED ITEMS
The following information and/or corrections are needed prior to conducting a full plan review:
1. Where is the cinema in relation to this structure? There are additional hose valve requirements for the walkways between the garage and the cinema. Please reference the information on this requirements included.
2. Addresses are incorrect in the title block.
Also review the disapproved plans for additional written comments prior to submittal of new plans.
|
| Disapproved | (STANDARD COMMENT 53 NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS.
THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.
|