NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING. System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.
RESIDENTIAL HILLSIDE HOME 00350 LOWICK DR
| Review Date | Status | Comment(s) |
| 11/13/2009 |
Approved/Corrected | STRUCTURE SIZE/WATER. The size of this structure --6640-- sq feet, and type VB construction, requires ---2250- gpm and a minimum of --2-- fire hydrant(s) within -225--- feet of the structure - as the truck would drive on approved HS-20 loading roads designed to the CSFD specifications.
On this site the theoretical water flows are --3200-- gpm, and the numbers of hydrant(s) are --2--. This site, based upon the provided theoretical modeled fire flows, appear to meet the minimum flow requirements and/or the number of hydrant(s) for this structure. |
| Approved/Corrected | The new Residential Plan Review Checklist has been completed and submitted as requested. |
| 11/5/2009 |
FYI | This Project is - Residence 350 Lowick Dr. - Hillside
See our web site for our latest plan review comments for your job at www.springsgov.com/fire, click on "Fire Prevention", and then on "Review Plan Status." smc 8-01 |
| FYI | STRUCTURE SIZE/WATER. The size of this structure ---6440- sq feet, and type VB construction, requires --2250-- gpm and a minimum of --2-- fire hydrant(s) within --225-- feet of the structure - as the truck would drive on approved HS-20 loading roads designed to the CSFD specifications.
On this site the theoretical water flows are ---- gpm, and the numbers of hydrant(s) are ----. This site, based upon the provided theoretical modeled fire flows, appear to meet the minimum flow requirements and/or the number of hydrant(s) for this structure. |
| Attention | ON SITE FIRE HYDRANT FLOWS: PRIOR TO THE TIME OF FIRE FINAL INSPECTIONS, on all new construction sites, it will be the responsibility of the owners, GC, or site manager, to have all new and existing fire hydrants, and private water systems flow tested.
Contact SEAN HIGBEE, CSU at 668-4595 to schedule an ACTUAL flow test of CITY OWNED/PUBLIC hydrants. Be sure to provide them with a CSFD plan review number to include with their flow reports.
|
| Attention | DEVELOPMENT/SITE (HIGH/VERY HIGH/EXTREME)
This lot has been identified as "High/Very High/Extreme" on the Colorado Springs Fire Department Wildfire Behavior Index. "NONCOMBUSTIBLE CONSTRUCTION" is required for use. |
| Disapproved | The fire flow calculations included with this plan are more than one year old. Please obtain a current calculation and resubmitt with plans. |
| Disapproved | NO RESIDENTIAL PLAN REVIEW CHECKLIST. Please copy, fill out, and submit the "Residential Plan Review Submittal Form" for all hillside home plans submitted to CSFD. Without this requested information we can not do a complete review of your submittals.
ATTENTION: The Residential Construction Plan Submittal Form" is now available on our web site. www.springsgov.com - go to "City Agencies" (tab on the teal bar to get a drop box) - click on - "Fire Department" - (Using the links down the left side of the page), click on - "Web Guide." Once you're into the Web Guide, click on "Fire Prevention Information Packets" Look under the Construction heading for the Residential Construction Plan Review Submittal Form This will also give you access to our packets, and numerous other items that may assist you in your future project design work.
|
| Attention | Fire Flow/Hydrant Report:is to be attached to all sets of construction plans for CSFD plan reviews.
Please contact Keta Donegan @ 668-8733 - FAX 668-5651 to arrange for a computer generated fire flow calculation. Computer modeling of fire flows is the ONLY data being accepted for fire flow calculations. This report must be included with the construction plan submittal.
When contacting Keta Donegan, she will need the following items to provide you with an accurate flow report:
The GROSS SQUARE FOOTAGE OF THE STRUCTURE - AND THE TYPE OF CONSTRUCTION, Requester and Company Name, Project location address and an intersecting street name(s), Phone and fax number of the requester, Provide the public hydrant number - this can be determined by faxing a map of the project area to the requester.
ALLOW A MINIMUM OF 2 DAYS FOR ALL FIRE FLOW CALCULATIONS
NOTE: THE FIRE FLOW CALCULATIONS ATTACHED TO THIS PLAN ARE MORE THAN ONE YEAR OLD. PLEASE OBTAIN CURRENT INFORMATION AND ATTACH WITH RE-SUBMITTAL |
| Attention | CORRECTIONS. All corrections and comments are to be submitted back to CSFD in writing, or provide submittal sheets/drawings/ blueprints etc. as requested, which will allow us to complete our review. We do not accept plan review corrections over the phone, via fax, or verbally.
See our web site for our latest plan review comments for your job at www.springsgov.com/fire, click on "Fire Prevention", and then on "Review Plan Status." This site is updated twice daily.
|
| Attention | FUELS MANAGEMENT. This lot is subject to the requirements of the City Code establishing minimum fire fuel management safety criteria for residential construction in hillside areas.
For additional information concerning this issue - contact our Firewise Program Division at 385-7281 or www.springsgov.com/fire
NOTE: THE INSPECTOR WILL REQUIRE FUELS MANAGEMENT COMPLIANCE WITHIN 30' OF ALL EXTERIOR PORTIONS OF CONSTRUCTION. |
| FYI | HILLSIDE GENERAL COMMENTS
The CSFD cannot assure fire emergency response to this lot(s) due to access related problems within hillside response areas. ie: snow, increased grades, narrow roadways.
Residing in or near wildland/wildfire interface or intermix areas involves increased fire risks that may not apply in urban or more urbanized types of developed communities. ie: increased fuel loading, low water pressures, longer response times. |
| FYI | HILLSIDE DRIVEWAYS: When driveways serve as a fire department access road, the width shall be a minimum of twelve feet (12-ft) and having a slope of twelve percent (12%) or less. |
| FYI | (EMBRES) - RE-REVIEWS
Re reviews may be submitted back to the CSFD by direct submittal at the Development Review Enterprise counter (2880 International Circle, Suite 200-7), or through the Regional Building Department's routing system.
In addition to resubmitting, you may also schedule a re review meeting. Depending on the complexity of the re review, Plans Examiner Rhonda Embres may meet with you to perform the re review. You may contact Rhonda at (719) 385-7369.
Re-reviews are typically turned around in a faster manner than the original review. |
| FYI | INSPECTOR JOHNSON: STATIONS 1, 2, 3, 4, 5, 9,13, 16:
Your assigned Inspector is Kris Johnson You may contact him at 719-385-7257 to schedule all construction related inspection activities.
GENERAL INSPECTIONS/PLANS & SCHEDULING. Minimum notice of two business days is required for all inspections. Due to work loads, holidays, meetings, vacations, etc...the CSFD cannot guarantee a two business day turnaround on all inspections. PLEASE help yourself by helping us - call your inspections in with ample time to allow adequate scheduling.
When calling, please have your complete CSFD plan review number(s) ready for each inspection request.
( For Example: 2005-1234- HS-2)
The CSFD APPROVED sets of plans SHALL be on site for all inspections. We cannot accept inspection requests over the fax or answering machines. |
|