NOTE - THE NOTED DISAPPROVED ITEMS MAY NOT CONSTITUTE A COMPLETE LIST OF VIOLATIONS. THE DESIGNER IS TO CONDUCT A COMPLETE RE-REVIEW OF THE PLANS FOR ADDITIONAL VIOLATIONS OF THE STANDARD COMMENTS AND INCORRECT INFORMATION PRIOR TO RESUBMITTING.

 System plans must be picked up within 30 days. All system plans left longer than 30 days will be discarded as abandoned.

 
   

Review DateStatusComment(s)
2/25/2013 ApprovedPlans submitted for re-approval.
Attention(STANDARD COMMENT) READY FOR SIGNATURES: The water plans appear ready for signature as long as all disapproved comments have been addressed. Please provide one hard copy for CSFD records along with your final copies for our signature.
11/9/2004 ApprovedCOMMERCIAL Provide items: Correct addresses. DONE. 4605/4615 Town Center Drive CSFD Plan I.D. #20040460-FH-1. DONE. Provide records copy - CSU hydrant flow report. DONE. Provide records copy of final water plans we are signing off at time of our final review with mylars. DONE. Additional hydrant required for min quantity (Lot 2 building) and coverage of Lot 1 building. DONE.
ApprovedHYDRANTS: COMMERCIAL REQ: Size of Structure: 4800 sq ft (lot 1), 14400 sq ft (Lot 2) Type of construction: VN Is building sprinklered? N Area Separation Walls (ASW) being installed? N Largest area formed from ASW? N/A GPM requirements: 1750 gpm (Lot 1), 3250 gpm (Lot 2) Number of hydrant(s) required: 1 (Lot 1), 3 (Lot 2) Max. spacing between hydrants: 400 ft (Controlled by Lot 2) Max. hose lay: 225 ft Max. distance between hydrant to 150 ft of all portions of bldg 1st floor: 200 ft (distances measured as the fire truck would drive on HS-20 load bearing - asphalt or concrete roads) "ON SITE" REQUIREMENTS: "ON SITE" INFORMATION PROVIDED FOR REVIEW? Y On site fire flows are 2700-3700 gpm where 3250 gpm required Is this a simultaneous flow? Y On site number of hydrant(s) are 3 where 3 are required Are hydrants blocked by parked vehicles, fences, walls, etc? N
8/11/2004 FYIThis project is: Remad Subdivision, Lots 1 & 2, Filing 2. ATTENTION: See our web site for our latest plan review comments for your job at: www.springsgov.com - go to "City Agencies" (tab on the teal bar to get a drop box) - click on - "Fire Department" - (Using the links down the left side of the page), click on - "Web Guide." Once you're into the Web Guide, click on "Plan Review Status" This will also give you access to numerous other items that may assist you in your future project design work.
FYIATTENTION - RE-REVIEWS OF PLANS: ON ALL WATER PLAN RE-REVIEW SUBMITTALS, WE HIGHLY RECOMMEND THAT YOU WRAP A SHEET OF BRIGHTLY COLORED PAPER AROUND THE OUTSIDE OF THE PLANS WITH BOLD LETTERING CLEARLY STATING "RE-REVIEW" ON THIS SHEET! THIS WILL HELP US TO IDENTIFY THE PLANS THAT ARE IN FOR A RE-REVIEW, AND HELP EXPEDITE THEM FOR THEIR NEXT REVIEW. WE TRY TO DO RE-REVIEWS OF WATER PLANS ON TUESDAY AND THURSDAY OF EACH WEEK. THANK YOU FOR YOUR ASSISTANCE WITH THIS!
FYIATTENTION: All fire department fees are to be paid prior to issuance of any permits.
DisapprovedHYDRANTS: COMMERCIAL REQ: Size of Structure: 4800 sq ft (lot 1), 14400 sq ft (Lot 2) Type of construction: VN Is building sprinklered? N Area Separation Walls (ASW) being installed? N Largest area formed from ASW? N/A GPM requirements: 1750 gpm (Lot 1), 3250 gpm (Lot 2) Number of hydrant(s) required: 1 (Lot 1), 3 (Lot 2) Max. spacing between hydrants: 400 ft (Controlled by Lot 2) Max. hose lay: 225 ft Max. distance between hydrant to 150 ft of all portions of bldg 1st floor: 200 ft (distances measured as the fire truck would drive on HS-20 load bearing - asphalt or concrete roads) "ON SITE" REQUIREMENTS: "ON SITE" INFORMATION PROVIDED FOR REVIEW? N On site fire flows are PENDING gpm where 3250 gpm required Is this a simultaneous flow? PENDING On site number of hydrant(s) are PENDING where 3 are required Are hydrants blocked by parked vehicles, fences, walls, etc? N -- SPECIFICATIONS do NOT Comply and are disapproved Reason for disapproval: Current fire flow information not adequate or not provided One additional Hydrant required- See redlines NEED MODELED fire flow data? Contact - Colo. Spgs. Utilities (CSU) - Keta Donegan @ 668-8733, FAX 668-5651 - she will provide MODELED flow report information to you. NOTE - Allow 2 days for CSU to provide data. UFC 901.2.2.2. dem 1/04
DisapprovedThis water plan, as submitted, is DISAPPROVED
DisapprovedATTENTION: PRIVATE FIRE HYDRANT USE AGREEMENT: To add a hydrant lateral off of the private main 2 lots to the West of this site, a private maintenance/use agreement between the lot owners must be signed & recorded. PRIVATE FIRE HYDRANTS LOCATED IN THE CITY OF COLORADO SPRINGS ARE NOT TO BE USED BY ANYONE OTHER THAN THE OWNER(S) OF THE FIRE HYDRANT(S). Not even the Colorado Springs Fire Department is permitted to use these hydrants for any purpose other than to put out a fire for the owners of the fire hydrants. It is for this reason that you must have city fire hydrants in the immediate vicinity, or, if there are private hydrants, you must have official permission from the owner(s) for you to use them for your new structure. Once you have spoken with the owners of the hydrant you must obtain a legal HYDRANT USE AGREEMENT between yourself and the owners of the hydrant(s). This is a legal document, and it must be registered through The County of El Paso as such. Once you have received your official paperwork back from The County, and it is correctly signed and sealed, the CSFD will grant approval for you to use the private hydrants as a part of the fire protection for your structure. For sample copies of the HYDRANT USER AGREEMENTS, please contact the CSFD Fire Prevention Division.
DisapprovedCOMMERCIAL Provide items: Correct addresses CSFD Plan I.D. #20040460-FH-1 Provide records copy - CSU hydrant flow report Provide records copy of final water plans we are signing off at time of our final review with mylars Additional hydrant required for min quantity (Lot 2 building) and coverage of Lot 1 building
FYION SITE FIRE HYDRANT FLOWS: PRIOR TO THE TIME OF FIRE FINAL INSPECTIONS, on all new construction sites, it will be the responsibility of the owners, GC, or site manager, to have all new and existing fire hydrants, and private water systems flow tested. Per the UFC, all hydrants are to be installed and in service PRIOR to any construction. ALL HYDRANT TESTS SHALL BE CONDUCTED BEFORE ON-SITE CONSTRUCTION IS STARTED!!! As with any new/revised fire protection system, the Fire Department will need to witness all tests to verify the system will meet the fire flow requirements established during the plan review process. If this test occurs without Fire personnel on site, it will be deemed unacceptable by the inspector thereby delay final approval. As with any new or revised fire protection system, the Fire Department will need to WITNESS all tests to verify the system will meet the fire flow requirements established during the plan review process. If this test occurs without Fire personnel on the site, it will be deemed unacceptable by the inspector thereby delay final approval of the project. smc 12/02 (UFC 103.3.2.1) Contact SEAN HIGBEE, CSU at 668-4595 to schedule an ACTUAL flow test of CITY OWNED/PUBLIC hydrants. Be sure to provide them with a CSFD plan review number to include with their flow reports. Contact CSFD Fire Prevention t 385-5959 to schedule a flow test of PRIVATE OWNED hydrants. A contractor capable of performing the test will be required as CSFD Inspectors WITNESS only. dem 1/04
FYIFire hydrants are to be painted in compliance with national color coding standards. By using these standards the emergency response crews are provided a quick way to decipher how much water is available from a specific hydrant. The gpm of the hydrants is determined by actual water flow tests, and it is imperative that the testing and color coding is accurate.
FYIThis is a combination public and private water line and hydrant system.


 