Back to City Engineering
line

Public Works - HOME
line
Roadway Team
line
Engineering Development Review
line
Stormwater
line
Permits, Applications and Fees
line
Pikes Peak Rural Transportation Authority (PPRTA)
line
*Academy/Fountain and Academy/Pikes Peak
line
*Austin Bluffs and Nevada Avenue Intersection
line
*Austin Bluffs Bridge Widening at Cottonwood Creek
line
*Austin Bluffs Corridor
line
*Austin Bluffs Interchange at Union Boulevard
line
*Bridge Repair and Maintenance
line
*Cimarron Street Bridge
line
*Congestion, Incident Management, and Signal Improvements
line
*Constitution and Circle
line
*Constitution Avenue and Chelton Road
line
*Fillmore and El Paso Intersection Improvements
line
*Fillmore Street - Hancock to Union Boulevard
line
*Fillmore Street Corridor Improvement Project
line
*Fillmore Street Corridor Transportation Study
line
*Hancock Avenue Bridge over Templeton Gap Floodway
line
*I-25 Interchange Companion Projects
line
*North Nevada Avenue Bridge Rehabilitation Project
line
*On-Street Bikeway Improvements
line
*Powers Boulevard Right of Way Protection/Acquisition
line
*Proby Parkway, Phase 1
line
*Roadway Safety and Traffic Operations
line
*Vincent Drive
line
*Woodmen Road
line
Reference Materials
line
Reimbursements
line
Pavement Design Criteria Manual (pdf)
line
Local Improvement Districts
line

Frequently Asked Questions
line

PO Box 1575, Mail Code 410
30 S. Nevada Ave, Suite 401
Colorado Springs, CO 80903
Phone: (719) 385-5918
Fax: (719) 385-5537
Email: cityengineering@sp. . .





City of Colorado Springs / City Engineering / Pikes Peak Rural Transportation Authority (PPRTA) / Proby Parkway, Phase 1

Proby Parkway, Phase 1

 

Completed interchange at the new Proby Parkway and Academy Boulevard
Aerial view of the completed interchange

Project Description: This project will implement the City portion of the Phase I improvements recommended by the South Metro Accessibility Study. The City portion will design and construct a new expressway (Milton E. Proby Parkway) between Academy Blvd. and Powers Blvd. This new expressway will be located just south of Drennan Rd. between Academy Blvd. and Hancock Expwy., and then will combine with existing Drennan Rd. as it approaches Powers Blvd. The project scope includes preliminary and final design, permitting, public information and outreach, right-of-way (ROW) acquisition, roadway construction and construction management.

The new roadway is named in honor of Milton E. Proby, a local civil rights leader who passed away in 2006. Reverend Proby was a pastor at St. John Baptist Church in Colorado Springs for 48 years.

Groundbreaking Ceremony May 18, 2010

July 2010 Construction Newsletter

October 2010 Construction Newsletter

January 2011 Construction Newsletter

April 2011 Construction Newsletter

August 2011 Construction Newsletter

 

Funding: PPRTA funds for this project are programmed as shown below:

Budget: $55.4 M (in 2009 dollars)

Completed ramps and bridges at Academy
Completed ramps and bridges at Academy

Estimated project schedule (Proby Parkway): Design of the Proby Parkway expressway improvements between Academy Blvd. and Powers Blvd. in 2005-2009; ROW acquisition in 2008-2009; and construction activities from 2010-2011.  Landscaping of the parkway will be completed in Spring 2012.

 

Project Managers: Clyde Pikkaraine, City PPRTA 719-385-5464; Mike Chaves, City Engineering Division 719-385-5408