Back to City Engineering
line

Public Works - HOME
line
Roadway Team
line
Engineering Development Review
line
Stormwater
line
Permits, Applications and Fees
line
Pikes Peak Rural Transportation Authority (PPRTA)
line
*Academy/Fountain and Academy/Pikes Peak
line
*Austin Bluffs and Nevada Avenue Intersection
line
*Austin Bluffs Bridge Widening at Cottonwood Creek
line
*Austin Bluffs Corridor
line
*Austin Bluffs Interchange at Union Boulevard
line
*Bridge Repair and Maintenance
line
*Cimarron Street Bridge
line
*Congestion, Incident Management, and Signal Improvements
line
*Constitution and Circle
line
*Constitution Avenue and Chelton Road
line
*Fillmore and El Paso Intersection Improvements
line
*Fillmore Street - Hancock to Union Boulevard
line
*Fillmore Street Corridor Improvement Project
line
*Fillmore Street Corridor Transportation Study
line
*Hancock Avenue Bridge over Templeton Gap Floodway
line
*I-25 Interchange Companion Projects
line
*North Nevada Avenue Bridge Rehabilitation Project
line
*On-Street Bikeway Improvements
line
*Powers Boulevard Right of Way Protection/Acquisition
line
*Proby Parkway, Phase 1
line
*Roadway Safety and Traffic Operations
line
*Vincent Drive
line
*Woodmen Road
line
Reference Materials
line
Reimbursements
line
Pavement Design Criteria Manual (pdf)
line
Local Improvement Districts
line

Frequently Asked Questions
line

PO Box 1575, Mail Code 410
30 S. Nevada Ave, Suite 401
Colorado Springs, CO 80903
Phone: (719) 385-5918
Fax: (719) 385-5537
Email: cityengineering@sp. . .





City of Colorado Springs / City Engineering / Pikes Peak Rural Transportation Authority (PPRTA) / I-25 Interchange Companion Projects

I-15 Interchange Companion Projects

The Bijou Bridge before reconstruction
Bijou Bridge Before
The new Bijou Bridge after construction
The Completed Bijou Bridge
Project Description: Bijou Street Bridge over Monument Creek/Railroad Tracks and Corporate Drive Extension/Bridge.

The Intergovernmental Agreement between the City and Colorado Department of Transportation (CDOT) allowed for the incorporation of these two projects in CDOT's I-25 Design/Build contract. The Corporate Drive project connected Nevada Ave. and Corporate Dr. including a bridge structure. The Bijou Bridge project replaced the bridge structure over Monument Creek and the Union Pacific Railroad including related City street improvements.

Project Cost: $10.3M (2005 = $0.1M; 2006 = $2.1M + $8M from CDOT (per Powers-Academy IGA); 2007 = $0.1M).

Project Schedule: City review of CDOT plans - 2005-2007; CDOT construction - 2005-2007; City reimbursement to CDOT - 2006.