Back to City Engineering
line

Public Works - HOME
line
Roadway Team
line
Engineering Development Review
line
Stormwater
line
Permits, Applications and Fees
line
Pikes Peak Rural Transportation Authority (PPRTA)
line
*Academy/Fountain and Academy/Pikes Peak
line
*Austin Bluffs and Nevada Avenue Intersection
line
*Austin Bluffs Bridge Widening at Cottonwood Creek
line
*Austin Bluffs Corridor
line
*Austin Bluffs Interchange at Union Boulevard
line
*Bridge Repair and Maintenance
line
*Cimarron Street Bridge
line
*Congestion, Incident Management, and Signal Improvements
line
*Constitution and Circle
line
*Constitution Avenue and Chelton Road
line
*Fillmore and El Paso Intersection Improvements
line
*Fillmore Street - Hancock to Union Boulevard
line
*Fillmore Street Corridor Improvement Project
line
*Fillmore Street Corridor Transportation Study
line
*Hancock Avenue Bridge over Templeton Gap Floodway
line
*I-25 Interchange Companion Projects
line
*North Nevada Avenue Bridge Rehabilitation Project
line
*On-Street Bikeway Improvements
line
*Powers Boulevard Right of Way Protection/Acquisition
line
*Proby Parkway, Phase 1
line
*Roadway Safety and Traffic Operations
line
*Vincent Drive
line
*Woodmen Road
line
Reference Materials
line
Reimbursements
line
Pavement Design Criteria Manual (pdf)
line
Local Improvement Districts
line

Frequently Asked Questions
line

PO Box 1575, Mail Code 410
30 S. Nevada Ave, Suite 401
Colorado Springs, CO 80903
Phone: (719) 385-5918
Fax: (719) 385-5537
Email: cityengineering@sp. . .





City of Colorado Springs / City Engineering / Pikes Peak Rural Transportation Authority (PPRTA) / Austin Bluffs Corridor

Austin Bluffs Corridor

Public Open House February 6, 2013

Calvary United Methodist Church - 4210 Austin Bluffs Parkway - 5 - 7 p.m.

Come look at the final plans!

 

Public Participation:  The project team values the input and involvement of area residents, businesses and travelers.  The team welcomes and appreciates thoughtful, constructive suggestions and ideas.  Together, we'll identify the critical issues and priorities and define the criteria by which the solutions will be measured.

Project Description: This project will design and construct improvements to widen Austin Bluffs Parkway from Nevada Avenue to Ruby/Old Farm Drive.  Construction done under previous projects along the corridor will be utilized, as much as possible, to end up with a consistent six lane arterial corridor within the project limits. Specifically, improvements at Austin Bluffs/ Nevada, Austin Bluffs/Academy, and Austin Bluffs/Old Farm will be incorporated into the project improvements.

The objectives of this project include:

  • Improved east-west mobility per the East-West Mobility Study
  • Reduce accidents and congestion at signalized intersections
  • Enhance roadway capacity and safety
  • Adhere to the City's "complete streets" concept along the corridor

Project Website:  http://www.austinbluffscorridor.com

Project Hotline: 719-302-6782

 


Project Managers: Clyde Pikkaraine, City PPRTA 719-385-5464; Mike Chaves, City Engineering 719-385-5408
This project is made possible with your tax dollars