Back to City Engineering
line

Public Works - HOME
line
Roadway Team
line
Engineering Development Review
line
Stormwater
line
Permits, Applications and Fees
line
Pikes Peak Rural Transportation Authority (PPRTA)
line
*Academy/Fountain and Academy/Pikes Peak
line
*Austin Bluffs and Nevada Avenue Intersection
line
*Austin Bluffs Bridge Widening at Cottonwood Creek
line
*Austin Bluffs Corridor
line
*Austin Bluffs Interchange at Union Boulevard
line
*Bridge Repair and Maintenance
line
*Cimarron Street Bridge
line
*Congestion, Incident Management, and Signal Improvements
line
*Constitution and Circle
line
*Constitution Avenue and Chelton Road
line
*Fillmore and El Paso Intersection Improvements
line
*Fillmore Street - Hancock to Union Boulevard
line
*Fillmore Street Corridor Improvement Project
line
*Fillmore Street Corridor Transportation Study
line
*Hancock Avenue Bridge over Templeton Gap Floodway
line
*I-25 Interchange Companion Projects
line
*North Nevada Avenue Bridge Rehabilitation Project
line
*On-Street Bikeway Improvements
line
*Powers Boulevard Right of Way Protection/Acquisition
line
*Proby Parkway, Phase 1
line
*Roadway Safety and Traffic Operations
line
*Vincent Drive
line
*Woodmen Road
line
Reference Materials
line
Reimbursements
line
Pavement Design Criteria Manual (pdf)
line
Local Improvement Districts
line

Frequently Asked Questions
line

PO Box 1575, Mail Code 410
30 S. Nevada Ave, Suite 401
Colorado Springs, CO 80903
Phone: (719) 385-5918
Fax: (719) 385-5537
Email: cityengineering@sp. . .





City of Colorado Springs / City Engineering / Pikes Peak Rural Transportation Authority (PPRTA) / North Nevada Avenue Bridge Rehabilitation Project

North Nevada Avenue Bridge Rehabilitation Project

North Nevada Avenue Bridge
North Nevada Avenue Bridge
The bridge was originally constructed in 1947.  The concrete deck and railings have reached the end of their useful life and are in need of replacement.  Holes have formed in the deck, which have required the installation of steel plates.  The railings are in poor condition.

Project Description: The concrete deck and bridge railings will be completely replaced using staged construction.  The first stage will replace the deck and railings on the northbound structure.  The second stage will address the southbound structure.  Other project work will include rehabilitation of other portions of the structures, improving pedestrian facilities, landscaping at the south end of the bridge, accommodating future streetcar service and permanently closing the median at Lilac Street.

During construction, one lane of traffic will be maintained in each direction.  Access to residences and businesses will be maintained throughout construction.

Schedule:  Construction began in December 2012 with an anticipated completion date of March 2014. 

Total Project Cost: $2,400,000

Project Manager: Aaron Egbert - City Engineering 719-385-5465

 

Public Meeting Presentations